Similar Projects
NMSU Agricultural Modernization - Bid Lot 4
New Construction
Bidding
Las Cruces, NM

Art Classroom Renovations
Renovation
Post-Bid
$4,700,000 est. value
Albuquerque, NM 87106

Harlan Hall Phase III
Post-Bid
Silver City, NM 88062

Construction Manager at Risk Gallup Campus New Physical Plant and Storage Facility
New Construction - 7,200 SF
Results
$2,000,000 est. value
Gallup, NM

Nexus Phase 1 Renovation
Renovation
Results
Portales, NM

Physical Plant Steel Storage Buildings
Construction
Portales, NM 88130

Construction Manager at Risk- HSC Center of Excellence for Orthopedic Surgery and Rehabilitation
Post-Bid
Less than $21,000,000 est. value
Albuquerque, NM 87131

Architect Services Harlan Hall
Renovation - 32,330 SF
Results
Less than $3,500,000 est. value
Silver City, NM 88061

UNM Job Order Contracting
Post-Bid
Albuquerque, NM 87131

UNM Construction Manager at Risk (CMAR)- UNM Taos College Pathways to Careers Center
Results
Less than $5,575,000 est. value
Albuquerque, NM

UNMH Main Operating Room - Pre-Op and Locker Room Renovations
Renovation
Post-Bid
Less than $1,200,000 est. value
Albuquerque, NM

UNM Student Health Counseling Center Renovation
Renovation
Results
Albuquerque, NM 87131

UNM Valencia Infrastructure
Post-Bid
Less than $3,813,206 est. value
Albuquerque, NM 87131

UNM On-Call Contractors
Results
Albuquerque, NM 87131

UNMH ACC - Facilities - Ambulatory Elevator Refurbishment (4,5,6)
Renovation
Post-Bid
Albuquerque, NM 87106

Reported 05/15/2020 12:00 AM
Project Title

CMAR for The NMJC Caster Hall Renovation Project

Physical Address View project details and contacts
City, State (County) Hobbs, NM 88240   (Lea County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Sub-Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The project will be constructed in four phases over the course of one year, including the addition of a new auxiliary gymnasium, a new entry addition, and extensive renovations throughout.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents