Similar Projects
Last Updated | 11/11/2021 08:05 AM |
Project Title | Replace Gas Packs at College Lakes Elementary School |
Physical Address | View project details and contacts |
City, State (County) | Fayetteville, NC 28311 (Cumberland County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $2,000 to $30,000 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall remove and dispose of two existing package units and one split system. The contractor shall install a new 10 ton gas pack, 3 ton gas pack and a 3.5 ton split heat pump with thermostats. The contractor shall supply new disconnects as needed with new conduit and power wire from the new disconnect to the new unit. All duct work shall be sealed with mastic. The contractor shall supply and install a roof curb/adapter for each gas pack. The new equipment shall match existing equipment BTU, voltage and phase. The contractor shall connect the gas packs to the existing gas line. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |