Similar Projects
RR-21-4573 I-90 AET Plaza Modifications Mile Post 53.6 to Mile Post 79.5
Bidding
Downers Grove, IL

Repair Roads and Concrete
Bidding
$500,000 est. value
Glen Ellyn, IL

Supply of Asphalt Emulsion, Sealer Materials
Term Contract
Post-Bid
West Chicago, IL 60185

Poly Fiber Firm Asphalt Crack Sealant Material
Post-Bid
Downers Grove, IL 60515

Gregory Avenue and Somerset Drive Reconstruction
Results
$1,081,025 est. value
Glendale Heights, IL 60139

Three School Asphalt Paving
Results
Naperville, IL 60540

Devon-Park-Pierce Intersection Improvements
Pending Verification
Itasca, IL 60143

RR-21-4577 - Plaza Improvements
Bidding
Downers Grove, IL

Crack Sealing Bituminous Pavement
Term Contract
Post-Bid
Addison, IL 60101

2020 Wayne MET Road Program
Results
Less than $275,000 est. value
Wayne, IL 60184

2021 Crack Sealing Bituminous Pavement
Bidding
Bloomingdale, IL

20-110 Hot-Mix Asphalt Surface Removal
Term Contract
Post-Bid
Wheaton, IL 60187

2020 Paving
Results
$196,500 est. value
Wheaton, IL 60189

Herrick MS and Henry Puffer ES Paving Improvements
Bidding
Downers Grove, IL 60515

RR-16-4253 - CO#51 - ATP# 69.1 - I-88 Roadway and Bridge Rehabilitation
Post-Bid
Downers Grove, IL 60515

Last Updated 10/15/2020 12:06 PM
Project Title

2020 16th Street Resurfacing

Physical Address View project details and contacts
City, State (County) Oak Brook, IL 60523   (DuPage County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $228,383
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

16th Street to Spring Road - Total project length is approximately 1,910 linear feet. Work includes PCC and HMA milling and HMA resurfacing, median removal and replacement, curb and gutter replacement, drainage structure repairs, detector loop replacement and landscape restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents