Similar Projects
Bridge 00002 Repair by Replacement
Design
$1,000,000 to $2,000,000 est. value
Fort McCoy, WI

Ancillary Structure Rehab / Replace 2021, Locations on STN Per Annual Plan
Bidding

Ancillary Structure Rehab / Replace 2021, Locations on STN Per Annual Plan
Bidding

German Creek Bridge P-3-43 CTH M
Post-Bid
$300 est. value
WI

Rehabilitation of the West Cherry Street Bascule Bridge Over the Milwaukee River
Post-Bid
Milwaukee, WI 53202

Corporate Drive Bridge Replacement
Renovation
Results
Brookfield, WI 53005

Rocky Run Snowmobile Bridge Replacement
Results
Portage, WI 53901

Baldwin - Menomonie, CTH NH Bridge Eastbound
Bidding
Baldwin, Menomonie, WI

Linden Drive Temporary Bridge Over Willow Creek
Post-Bid
Madison, WI 53787

State Street Lift Bridge - Balancing
Results
$100,000 to $300,000 est. value
Racine, WI 53403

Albion - Fort Atkinson, STH 73 - Park Drive
New Construction
Bidding
Fort Atkinson, WI 53538

Timber Bridge Deck
Post-Bid
WI

Snowmobile Bridge Replacement Little Sugar River - Dane 16 Bridge
Results
New Glarus, WI 53574

Madison - Portage, USH 51 Bridges
New Construction, Term Contract
Bidding
Rothschild, WI 54474

Historic Lake Park Ravine Bridge Over Ravine Road
New Construction
Post-Bid
Milwaukee, WI 53211

Reported 06/03/2021 12:00 AM
Project Title

2021 Colley Road and Stateline Road Bridge Deck Sealing

Physical Address View project details and contacts
City, State (County) Beloit, WI 53511   (Rock County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Colley Road over Turtle Creek and S Stateline Road over Dry Creek Seal Bridge Decks with Polymer overlay Perform Polymer overlay contingent on sounding the deck. If any hollow spots or areas of delamination are found, they must first be patched before overlay can be completed.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents