Similar Projects
2021 Plant Mix
Infrastructure
Bidding
$5,800,000 est. value
VA

Sliding Hill Road New Ashcake Road Intersection
Infrastructure
Bidding
Mechanicsville, VA 23116

Paving Services
Post-Bid
VA

Brick Sidewalk Repair and Replace
Post-Bid
Abingdon, VA 24212

ANC McPherson Area Road Reconstruction
Results
$10,000,000 to $25,000,000 est. value
Arlington, VA

2020 Plant Mix
Results
Less than $556,000 est. value
VA

Shawneeland Sanitary District Road Improvement Project (Tar and Chip)
Infrastructure
Bidding
VA

Construct New Terminal Building Site Work - Phase 1
Post-Bid
Winchester, VA 22602

2020 Surface Treatment
Results
Less than $2,097,000 est. value

Blue Ridge Road Shared Use Path
Post-Bid
Glasgow, VA 24555

2020 Plant Mix
Results
Less than $4,673,000 est. value
VA

Dry River Road Corridor Improvements
Post-Bid
Bridgewater, VA

2020 Plant Mix
Results
Less than $15,052,000 est. value
VA

2018 Sidewalk Improvements Near Tobacco Trail
Post-Bid
Lawrenceville, VA

2020 Plant Mix
Results
Less than $2,402,000 est. value

Reported 08/04/2021 12:00 AM
Project Title

Downtown Streetscape Improvements, Phase 2

Physical Address View project details and contacts
City, State (County) Stanardsville, VA   (Greene County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project proposes to construct Phase 2 of the Stanardsville Downtown Streetscape Improvements by extending sidewalks previously installed as part of the Phase 1 project to both the east and west. Sidewalks will be constructed along the north side of Main Street from Rectory Lane to Madison Road and from Celt Road to an existing sidewalk at 8315 Spotswood Trail. Improvements include sidewalks, curbs, a pedestrian bridge, site walls, storm sewer, lighting, and landscaping. The total length of the improvements is 1,215 linear feet.

Details

Division 01 - General Requirements, Summary, Project Management and Coordination, Submittal Procedures, Quality Requirements, References, Quality Control, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Execution, Closeout Procedures.
Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Planting Preparation, Soil Preparation, Turf and Grasses, Plants.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents