Similar Projects
Applying Oil and Chip at Various Maintenance Yards
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Morton, IL 61733

Applying Oil and Chip at Various Maintenance Yards
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Morton, IL 61733

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Commodities And Services
Term Contract, Alteration
Post-Bid
Washington, IL 61571

RR-21-4821 Pavement Repairs
Infrastructure
Results

Fire Station 1 Parking Lot Rework
Infrastructure
Results
Pekin, IL 61554

Street Maintenance-Sealcoating and Fog Coating
Infrastructure
Post-Bid
South Pekin, IL

Resurfacing on IL-9 from East Chestnut St. in Tremont to just West of the Prairie Creek Bridge
Infrastructure
Results
IL

Architectural Barriers Removal-Sidewalks
Infrastructure
Post-Bid
Armington, Creve Coeur, Delavan, East Peoria, Mackinaw, Minier, South Pekin, Washington, IL

Pavement Patching and Hma Overlay project is located on Interstate 74 from 0.8 miles East of Morton to the Woodford Co Line
Infrastructure
Results
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Reconstruction and Widening of Courtland Street to a 5-Lane Section from Walton Avenue to Main Street
Infrastructure
Results
Morton, IL

Illinois Central College Campus Pavement
Infrastructure
Post-Bid
$185,000 est. value
East Peoria, IL 61635

Lincoln ES & SHS Site Improvements
Infrastructure
Results
Morton, IL 61550

Hot-Mix Asphalt Resurfacing of Harding Road in Morton Road District
Infrastructure
Post-Bid
$400,000 est. value
Morton, IL 61550

Last Updated 04/29/2023 02:32 PM
Project Title

Roadway Extension of Freedom Parkway

Physical Address View project details and contacts
City, State (County) Washington, IL 61571   (Tazewell County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $6,595,005 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway extension of Freedom Parkway from east of IL 8 to Cummings Lane in Washington. Region 3 District 4 VBP % 0 Federal Project # ZNU6(153) County(s) Tazewell Key Route(S) FAU 6745 Marked Route(S) Freedom Parkway Section(S) 20-00128-02-PV (WASHINGTON) State Job #(S) C-94-028-21 Pps #(S) 4-10689-0000 170 Working Days Questions not accepted as of April 18, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 155- Roadway Extension of Freedom Parkway This project includes the construction of a roadway extension of the existing Freedom Parkway from McClugage Road (Business US 24) to Cummings Lane. The roadway will consist of two through-lanes and bi-directional turn lane constructed of full depth hot-mix asphalt pavement on new alignment, curb and gutter, street lighting, closed drainage system, off-roadway shared-use path, bioswales, detention basin, portland cement concrete pavement intersection improvements at the Freedom Parkway/Cummings Lane intersection, traffic signals at the Freedom Parkway/Cummings Lane intersection, earthwork, pavement markings, accessible curb ramp improvements, signing, seeding, perennial plantings and all additional collateral work required to complete the project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents