Similar Projects
New Township Hall & Office
New Construction
Conception
$230,000 est. value
Wawaka, IN

City-County Building Renovation
Renovation
Conception
New Albany, IN

Courthouse Complex
New Construction - 170,000 SF
Design
$60,000,000 to $63,000,000 est. value
Dunlap, IN

Preservation Hall Interior Alterations
Renovation
Post-Bid
Newburgh, IN 47630

Lafayette Public Safety Facility & Parking Garage
New Construction
Post-Bid
Lafayette, IN

Marshall County Courthouse Building Envelope and Clock Tower Restoration
Renovation - 3,658 SF
Results
$500,000 est. value
Plymouth, IN 46563

Portage City Hall
Renovation
Results
Portage, IN 46368

Courthouse Basement
Renovation
Pending Verification
Princeton, IN

ADA Accessibility - City of Terre Haute
New Construction
Conception
$250,000 est. value
Terre Haute, IN

2019 Harrison County Courthouse
Renovation
Post-Bid
Corydon, IN 47112

Renovation of A Section of City Hall
Renovation
Results
Less than $46,500 est. value
Madison, IN 47250

Pulaski County Justice Center
New Construction
Post-Bid
Winamac, IN

Courthouse Chiller and Clinton County Jail Boilers & Chillers
Alteration
Results
Frankfort, IN 46041

Court Annex Building Remodel
Renovation, Demolition
Post-Bid
Bedford, IN 47421

Clinton County Courthouse Third Floor Renovation
Renovation
Results
Frankfort, IN

Last Updated 08/25/2022 03:33 PM
Project Title

Steuben County Courthouse Bid Phase #2: Roofing and Elevator

Physical Address View project details and contacts
City, State (County) Angola, IN 46703   (Steuben County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $290,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

NOTICE IS HEREBY GIVEN PURSUANT TO INDIANA CODE 5-32, AS AMENDED, that the Steuben County Board of Commissioners (the Owner ) and Weigand Construction Co., Inc. ( Weigand Construction or the CMc ), 7808 Honeywell Drive, Fort Wayne, Indiana 46825, have entered into a contract pursuant to which Weigand Construction will be providing all of the construction manager as construction services in connection with the New Steuben County Courthouse Building. Accordingly, Weigand Construction will be receiving sealed bids from prequalified contractors, as determined by Weigand Construction in its sole and complete discretion, for the Work and supply of materials for the New Steuben County Courthouse Building (the Project ). All bidding and construction shall be in accordance with construction documents prepared by RQAW all of the terms and conditions of which are incorporated herein by reference. Bidders desiring digital access to construction and bidding documents shall email Dave Garman of Weigand Construction at dgarman@weigandconstruction.com to receive digital access to the bidding documents at no cost. Bidders may be required by Weigand Construction, if set forth in the construction and bidding documents, to confirm or submit for pre-qualification status prior to receiving digital access to construction and bidding documents. Bidders desiring printed documents shall pay for their own cost of printing, shipping, and handling. Each bid shall include with such bid, a certified check or bid bond made payable to Weigand Construction Co., Inc. for an amount not less than five percent (5%) of the maximum bid. Should a successful bidder withdraw its bid or fail to execute a satisfactory sub-contract with the CMc, Weigand Construction may then declare the bid deposit or bid bond to be forfeited as liquidated damages. Each successful bidder shall enter into a sub-contract with Weigand Construction . Each successful bidder may be required to furnish Performance & Payment Bonds (if Alternate Bid regarding Bonds is accepted) which cover faithful performance of the contract and the payment of all obligations arising thereunder (if Alternate Bid regarding Performance Bond is accepted, it will be made out to Weigand Construction Co., Inc.). Said bonds shall remain in full force and effect for one year from the substantial completion of the Work. A bidder s ability to provide said bonds is a condition precedent to bidding the Project, and any bid submitted without an alternate cost for providing said bonds may be determined as non-responsive by Weigand Construction, in its sole and complete discretion, and rejected by Weigand Construction. If the alternate is accepted, the bonds will be made out to Weigand Construction Co., Inc. The contract will be awarded to the lowest responsive and responsible bidder complying with the conditions for bidding, provided the bid is reasonable and it is to the best interest of Weigand Construction and the Owner. Roofing and Elevator Bids may be hand delivered and/or delivered by delivery service at the locations listed above.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents