Similar Projects
Winery and Patio
New Construction, Infrastructure - 4,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rosemount, MN 55068

Bituminous Replacement and ADA Work
Alteration
Conception
$3,800,000 est. value
Akeley, MN 56433

Reconstruction and Resurfacing With Pedestrian ADA and Utilities
Infrastructure, Alteration
Design
$5,400,000 est. value
Barnesville, MN 56514

Fox Briar Ridge East Utility and Street Improvements
Infrastructure
Bidding
$225,000 est. value
Maple Grove, MN

Cherokee Regional Trail Improvements Project
Infrastructure
Bidding
$300,000 est. value
Saint Paul, MN 55107

West Bridge Street Reconstruction
Post-Bid
$3,400,000 est. value
Owatonna, MN

Meadowbrook Elementary School Parking Lot Improvements
Post-Bid
Golden Valley, MN 55422

ADA Improvements, Signal System, Lighting, Drainage
Results
MN

Sakatah Singing Hills State Trail Lime Valley Slope Failure
Results
Less than $356,970 est. value
Mankato, MN

Vita Attiva Development Expansion
New Construction, Infrastructure
Construction
Farmington, MN

Cornerstone Village Apartments
New Construction
Construction
$1,680,000 est. value
Oakdale, MN 55128

Resurface and ADA Work
Infrastructure
Conception
$2,700,000 est. value
Marshall, MN 56258

Grading, Aggregate Base, Bituminous Surfacing, Concrete Curb and Gutter, Concrete Walks, Water Main, Sanitary Sewer, and Related Restoration
Post-Bid
MN

2021 Street Renewal
Results
$1,750,000 est. value
Bemidji, MN

CSAH 1 and CSAH 32, CP 1260 Sidewalk Repair, Curb Replacement, Driveway Repair
Post-Bid
MN

Last Updated 07/18/2022 01:29 AM
Project Title

School Trail Improvements

Physical Address View project details and contacts
City, State (County) Saint Charles, MN   (Winona County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New bituminous trail through the woods behind the high school The extent of the work involved is furnishing all labor and materials for construction of the School Trail Improvements together with related subsidiary and incidental work including: The project consists of common excavation, aggregate base, bituminous paving, clearing, and grubbing of trees

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents