Similar Projects
NW 24th Street Culvert Improvements
Infrastructure
Bidding
$500,000 est. value
Coral Springs, FL 33076

John P. Lyons Lane Drainage Improvements
Infrastructure
Bidding
Pembroke Park, FL

Rotary Park: Ball Field Improvements
Renovation, Infrastructure
Sub-Bidding
Hollywood, FL 33021

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

Construction Management at Risk Services
Post-Bid
Hollywood, FL 33022

Port Everglades, South Jetty Rehabilitation 2020, Broward County, Florida
Results
$1,000,000 to $5,000,000 est. value
FL

Shore Protection Project, Segment II, Beach Renourishment 2020-2021, Broward County, Florida
Results
$20,000,000 to $30,000,000 est. value
FL

45th Year CDBG Drainage Improvement Project Northwest 7th Avenue
Post-Bid
Less than $189,761 est. value
Hallandale, FL 33009

Interchange/Modification/Bridge Widening/Drainage Improvements/Milling and Resurfacing
Results
Less than $26,400,000 est. value
FL

Construction of WTP Lime Sludge Holding Ponds Sheet Piles
Term Contract
Post-Bid
$620,000 est. value
Hollywood, FL 33024

Outfall Repair on SW 136th Avenue
Results
Less than $170,000 est. value
Davie, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

SBDD 2020 Fabric-Formed Erosion Protection
Results
Davie, Southwest Ranches, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Drainage Maintenance
Results
Less than $475,000 est. value
FL

Last Updated 10/14/2021 10:40 AM
Project Title

SW 202 Avenue Drainage Improvements

Physical Address View project details and contacts
City, State (County) Southwest Ranches, FL   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, the furnishing of all labor, materials, tools, equipment, machinery, expertise, services, and all else necessary and reasonably inferable for the addition of roadside drainage along SW 202nd Avenue including 4 catch basins, 16 linear feet (L.F.) of 15" HDPE culverts, 500 L.F. of 18" HDPE culverts to better capture stormwater runoff, plus pavement restoration for the site improvements. The proposed work is within the Right-of-Way of the Town of Southwest Ranches.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents