Similar Projects
Haas Library Fire Pump Replacement - Western CT State University
Renovation
Sub-Bidding
$75,000 CJ est. value
Danbury, CT 06810

District Wide Boiler/HVAC Maintenance
Alteration
Post-Bid
Naugatuck, CT

Mechanical and Electrical Upgrades at Monarca Place
Alteration
Post-Bid
$800,000 est. value
Middletown, CT 06457

Nathanael B. Greene Community Center Boiler Replacement
Results
Guilford, CT 06437

N041--689-21-3-4810-0975: Canteen Walk-In Cooler Repair
Results
West Haven, CT 06516

Chiller Replacement West Elementary School
Alteration
Post-Bid
$700,000 est. value
New Canaan, CT 06840

CVH - Phase 3 Steam Pipe Replacement
Term Contract
Results
$5,221,105 to $5,500,000 est. value
Middletown, CT 06457

Maintenance, Service and Repairs HVAC and Boiler Systems
Alteration
Post-Bid
Westport, CT 06880

Courtyard Hot Water Project at Scofield School
Renovation
Results
$500,000 est. value
Stamford, CT 06903

Boiler and Combustion Equipment Preventive Maintenance and Repairs
Alteration
Post-Bid
Wallingford, CT

Boiler & Burner Service
Alteration
Results
New Milford, CT

MacDougall Freezer Replacement
Alteration
Post-Bid
$120,000 est. value
Suffield, CT 06078

Generator Installation - New Haven Armed Forces Reserve Center
Renovation
Results
$198,275 CJ est. value
New Haven, CT 06512

Mechanical Upgrades at Three High Schools (Kennedy, Wilby, Crosby)
Alteration
Post-Bid
$300,000 est. value
Waterbury, CT 06708

Meriden Senior Center Boiler Replacement
Renovation
Results
$257,800 CJ est. value
Meriden, CT 06451

Last Updated 08/28/2023 02:11 PM
Project Title

Mechanical Improvements at Chippens Hill Middle School

Physical Address View project details and contacts
City, State (County) Bristol, CT 06010   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Each bid shall be accompanied by a Bid Security in the amount of 5 % of the bidders base bid amount, in the form of a Bid Bond made payable to the City of Bristol. The awarded contractor will be required to secure a Performance Bond and a Labor and Materials Bond, each in the amount of 100% of the contract award, provided by a surety licensed to do business in the State of Connecticut. The requirements for prevailing wage rates as outlined within C.G.S. 31-53 are to apply to the resultant contract award. The City of Bristol is accepting bids to install mechanical improvements at Chippens Hill Middle School. The Work of Project is defined by the Contract Documents and includes, but is not limited to, the following: 1. Heating, ventilation and air conditioning upgrades to the existing facility and other Work indicated in the Contract Documents.

Details

Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents