Similar Projects
Synopsis- Environmental Remediation Services & Construction for Rocky Mountain Arsenal
New Construction
Design
Commerce City, CO

63rd Water Treatment Facility Campus Electrical General Contract Qualification
Renovation
Bidding
Boulder, CO 80301

Filter Media for the Griswold Water Purification Facility
Alteration
Bidding
Aurora, CO 80014

Design-Build Svcs - Nelson-Flanders Water Treatment Plant Expansion Project
Post-Bid
Longmont, CO

Vail Pass Rest Area Water Treatment System
Post-Bid
CO

WWTP Blower Improvements
Results
Less than $300,000 est. value
Estes Park, CO 80511

Construction Manager at Risk-Water Treatment Plant Improvements Project
Results
Brighton, CO 80601

Florida River Estates Water System Improvements
Renovation
Construction
$2,100,000 est. value
Durango, CO 81302

Ritoro Operations Building and Wells A-2 and D-2 Project
New Construction, Infrastructure
Construction
$2,100,000 est. value
Elizabeth, CO 80107

Argo WTP PLC Upgrades
Renovation
Bidding
$200,000 est. value
Idaho Springs, CO 80452

Water Treatment Plant Hydropower
Post-Bid
Manitou Springs, CO 80829

Floor Drain Water Treatment Recycle Systems
Term Contract
Results

Howard Berry and Sid Copeland Water Treatment Plants Fluoride Feed Systems Replacement
Post-Bid
Louisville, CO 80027

Lone Tree Creek Water Reuse Facility BNR 3 and Clarifier 3 Reliability/Redundancy Improvements
Results
CO

Bulk N2 for Digester 2
Post-Bid
Brighton, CO 80603

Last Updated 12/16/2021 09:57 AM
Project Title

Pilot Aquifer Storage and Recovery Site Construction Manager

Physical Address View project details and contacts
City, State (County) Northglenn, CO   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a pilot aquifer storage and recovery (ASR) site at the City’s Water Treatment Facility (WTF). The City is seeking Statements of Qualifications (SOQ) from firms interesting in serving as a Construction Manager at Risk (CMAR) to contribute to the project design finalization and construction.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents