Similar Projects
Safety Improvement Project
Results
Less than $705,343 est. value
TX

Widen Existing Mainlanes from 4 to 6 Lanes
Results
Less than $47,665,145 est. value
TX

SFT -Safety Improvement Projects
Results
Less than $578,696 est. value
TX

Eagle Point Parkway and Medical Center Drive
Results
$1,500,000 est. value
Orange, TX 77630

Intersection Improvement Highway :FM1006
Bidding
$597,313 est. value
TX

2019 Bond Program Streets South of I-10
Results
Less than $1,245,455 est. value
Orange, TX 77630

Rehabilitate Existing Roadway
Results
Less than $2,494,309 est. value
TX

Street Improvements
Results
$239,000 est. value
West Orange, TX 77630

Allie Payne Road Repair
Results
Less than $154,856 est. value
Orange, TX 77632

Overlay Roadway
Results
Less than $1,118,680 est. value
TX

SFT - Safety Improvements
Results
Less than $1,210,852 est. value
TX

Surfacing / Roadway Restoration
Results
Less than $9,908,305 est. value
TX

Southern Region Disaster Recovery Support BPA
Results

Rubber Asphalt Cracksealing
Results
Less than $410,383 est. value
TX

2019 Bond Program Streets South of I-10 Phase 2
Results
Less than $195,544 est. value
Orange, TX 77630

Last Updated 06/30/2020 02:53 AM
Project Title

2020 Road Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Vidor, TX 77662   (Orange County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $373,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

City of Vidor 2020 Road Rehabilitation Project which generally includes but is not limited to: Re-working of existing asphalt surfaces and base materials, addition of cement slurry, application of primer, placement of hot mix asphalt, excavation and placement of asphalt stabilized base as required in the plans and specifications and the adjustment of manhole covers and water valve covers within the project limits. Streets in this project include Alma Circle, Jackson, 1st Street, North Tram Road and Lexington Drive to the limits shown on the plans and specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents