Similar Projects
SR 20/Unnamed Tributary to Red Creek - Fish Passage
Infrastructure
Design
$6,640,000 CJ est. value
Concrete, WA 98237

I-5 / Maddox Creek - Fish Passage
Infrastructure
Design
$15,457,000 CJ est. value
Mount Vernon, WA 98273

SR 534/Unnamed Tributary to Carpenter Creek - Fish Passage
Infrastructure
Bidding
$2,000,000 CJ est. value
Mount Vernon, WA 98274

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

2022 Waterline Replacements
Infrastructure
Post-Bid
$900,000 est. value
Anacortes, WA 98221

Tower Site Readiness Phase III Project
Infrastructure
Results
Arlington, Bothell, Darrington, Everett, Monroe, WA 98241

RFQ D/B - SR 20/Olson Creek and Unnamed Tributary to Skagit River - Fish Passage
Infrastructure
Results
$22,785,985 CJ est. value
Concrete, WA 98237

SR 530/Sauk River Roadway Embankment - Stabilization Top
Infrastructure
Design
$5,055,000 CJ est. value
Concrete, WA 98237

Darrington Wood Innovation Center
Infrastructure
Post-Bid
$9,650,000 est. value
Darrington, WA

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Results
$228,286,585 CJ est. value
Kirkland, WA 98033

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

Gossom On-site Septic System Installation
Infrastructure
Post-Bid
$100,000 CJ est. value
Sedro Woolley, WA 98284

Mount Vernon Library Commons
New Construction, Infrastructure
Post-Bid
$36,750,000 CJ est. value
Mount Vernon, WA 98273

Preschool Playground Remodel - Phase 1
Infrastructure
Post-Bid
$500,000 CJ est. value
La Conner, WA 98257

Last Updated 11/22/2022 02:34 PM
Project Title

Sedro - Woolley Site Improvements

Physical Address View project details and contacts
City, State (County) Sedro Woolley, WA 98284   (Skagit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $487,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Project Consists of, but is Not Limited to Grading, Site Work and Stormwater Improvements to the Dnr.'s Headquarters in Sedrowoolley. Substantial Completion Date is June 15, 2023. The Project is Located at 919 N Township Street, Sedro-woolley, Wa 98284. The State Reserves the Right to Accept or Reject Any or All Proposals and to Waive Informalities. To Do This Work, the Contractor Must Have Adequate Insurance to Hold the State Harmless, Pay State Prevailing Wage Rates, and Have a Washington State Contractor's License. Question Deadline: 10/24/2022 Performance Bond: 100% Payment Bond: 100%

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents