Similar Projects
Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

Mill, AC Resurfacing, Full Depth Reclamation, Pipe Work
Infrastructure
Conception
$10,947,000 CJ est. value
Fort Pierre, SD 57532

Slide Repair, Erosion Control, Pipe Work
Infrastructure
Design
$1,061,000 CJ est. value
Fort Pierre, SD 57532

Slide Repair, Erosion Control, Pipe Work
Infrastructure
Design
$1,061,000 CJ est. value
Fort Pierre, SD 57532

2024 Crack Sealing and Joint Sealing
Infrastructure
Bidding
$217,000 CJ est. value
Fort Pierre, SD 57532

2024 Crack Sealing and Joint Sealing
Infrastructure
Bidding
$217,000 CJ est. value
Fort Pierre, SD 57532

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Asphalt Surface Treatment
Infrastructure
Results

OSRWSS South Coreline Reservoir and Pump Station No. 1 Upgrades
Renovation, Infrastructure
Results
$5,470,000 CJ est. value
Fort Pierre, SD 57532

Water Storage Tank - City of Fort Pierre
New Construction, Infrastructure
Conception
$1,760,000 CJ est. value
Fort Pierre, SD 57532

AC Surfacing of Shoulders
Infrastructure
Design
$2,877,000 CJ est. value
Fort Pierre, SD 57532

2024 Fort Pierre Asphalt Surface Treatment
Infrastructure
Bidding
$525,000 CJ est. value
Fort Pierre, SD 57532

2022 Fort Pierre Asphalt Surface Treatment
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Fort Pierre, SD 57532

Structure and Approach Grading
Infrastructure
Conception
$1,500,000 CJ est. value
South Stanley, SD 57532

Last Updated 02/14/2024 08:36 AM
Project Title

Spot Grad, Mill and ACC Resurf, Pipe, GR

Physical Address View project details and contacts
City, State (County) Fort Pierre, SD 57532   (Stanley County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $9,135,065 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

County - Lyman, Stanley SWPPP = 23.20 AC Contract Id: 8857 DBE Goal: Not Specified Length - 11.002 Type of Work - Spot Grading, Cold Milling, Asphalt Concrete Resurfacing, Pipe Work; Approach Guardrail, Erosion Repair Description of Location - SD1806 - Fm SD273 N 11.3 to the Lyman/Stanley Co Line; SD1806 - 6.4 NW of SD271 Over Cedar Ck, 6.7 NW of SD271 Over Straight Ck All bids will be checked for qualifications with results posted on the SDDOT website. The Department of Transportation reserves the right to reject any or all bids. SDDOT - Item no 07 - Spot Grad, Mill and ACC Resurf, Pipe, GR

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents