Similar Projects
Holiday Decorating Services for Town Center
Term Contract, Alteration
Bidding
Lady Lake, The Villages, Wildwood, FL 32162

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Electrical Improvements to Lift Station E9
Results
Less than $59,123 est. value
Clermont, FL

Intent to Utilize the FL Sheriff`s Association Contract to Purchase Generator
Results
Clermont, FL

Intent to Utilize Sourcewell Contract for Generator Parts, Supplies and Services
Post-Bid
Clermont, FL

Power Sonic - Liebert UPS Batteries
Results
FL

Specifications For Electrical Construction Repair To Damaged Utility Lines In Post Disaster Environment
Post-Bid
Moore Haven, FL

Generator for New Animal Shelter Facility
Results
Less than $60,000 est. value
Tavares, FL 32778

Hanger Fans
Term Contract
Post-Bid

Electrical Improvements to Lift Station E5
Results
Less than $65,000 est. value
Clermont, FL 34711

Radio Tower Building Switch Upgrade
Term Contract, Alteration
Post-Bid

4142 Lift Station Generators - Furnish & Install
Results
$285,000 to $295,900 est. value
Leesburg, FL 34748

NPS, Liebert UPS Semi Annual Maintenance
Term Contract
Post-Bid
Homestead, FL 33030

5134 Transformers - Sale and Removal
Results
Less than $25,250 est. value
Leesburg, FL 34748

Last Updated 08/24/2021 08:40 AM
Project Title

Fire Station 1 - Generator Replacement Design-Build

Physical Address View project details and contacts
City, State (County) Clermont, FL 34711   (Lake County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $275,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Disconnect all electrical components and mounting hardware from existing generator. Remove existing generator and automatic transfer switch. Pour new generator pad. Proposed new location is behind Fire Station #1. Furnish and Install new 275KW diesel generator. Replace the current ATS and rework of utility power & wiring to generator, as required. Reroute required utility, building load and generator cables. Install new remote annunciator and install new EPO switch. Install new remote annunciator and install new EPO switch

Details

Division 26 - Electrical, Packaged Generator Assemblies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents