Similar Projects
Mountain Laurel Resort
New Construction
Conception
White Haven, PA 18661

Arthur J. Rooney Field Perimeter Wall
New Construction
Conception
Pittsburgh, PA 15282

Kensington High School Building Envelope Renovation
Design
Philadelphia, PA

Lehigh Valley Regional Charter Academy
New Construction - 215,030 SF
Design
Bethlehem, PA 18020

Bid Package 2 - Interior Renovations and Upgrades - General Construction
Renovation, Addition
Bidding
Berwyn, Devon, Wayne, PA 19333

New Construction of the Community Athletic Building
New Construction - 68,300 SF
Bidding
Shillington, PA 19607

Saint Patrick's Parish Lower School Addition
Addition - 5,067 SF
Post-Bid
$500,000 est. value
Malvern, PA 19355

Springfield High School Phase 2 - Bid Package 3
New Construction - 10,000 SF
Post-Bid
Springfield, PA 19064

Spring Cove Middle School Vestibule Project - General Construction
Results
Roaring Spring, PA 16673

High School Gym Renovations - General Construction
Results
Titusville, PA 16354

Rose Rent Lofts
Renovation, Demolition - 66,600 SF
Construction
$7,000,000 est. value
Chambersburg, PA 17201

Shadyside Skating Complex at Hunt Armory
Renovation - 117,526 SF
Construction
$32,000,000 est. value
Pittsburgh, PA 15206

Veritas Academy
Renovation, Addition - 46,000 SF
Pending Verification
Leola, PA 17540

Kiski Area Intermediate School Renovation
Renovation
Conception
Vandergrift, PA 15690

Clifton Heights Middle School
New Construction
Design
$65,000,000 est. value
Clifton Heights, PA 19018

Reported 02/24/2022 12:00 AM
Project Title

2022 Summer Work - General Construction

Physical Address View project details and contacts
City, State (County) Jenkintown, PA   (Montgomery County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) Athletic Facility, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the complete renovations of (6) Toilet rooms as well as a classroom renovation and two gymnasiums. Work includes but is not limited to renovations of existing spaces, new related finishes, fixed casework, new bathroom fixtures and accessories, new mechanical HVAC systems, and lighting systems.

Details

Middle/Senior High School, Renovation, Athletic Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents