Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Woodleaf
New Construction, Infrastructure
Conception
$191,700,000 CJ est. value
Smithfield, NC 27577

Clayton Village Center Mixed Use Development
New Construction, Infrastructure - 80,000 SF
Design
$25,000,000 CJ est. value
Clayton, NC 27520

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Smithfield-selma Senior High School New Multipurpose Auxiliary Gym
New Construction, Infrastructure - 12,594 SF
Bidding
$5,000,000 CJ est. value
Smithfield, NC 27577

RFQ D/B - Timothy G. Broome Water Treatment Plant Expansion
Addition, Demolition, Infrastructure
Post-Bid
$55,200,000 CJ est. value
Smithfield, NC 27577

Hangar Site Development and Parking Lot Expansion - Rebid
Demolition, Infrastructure
Post-Bid
$4,445,852 CJ est. value
Smithfield, NC 27577

Firearms Training Facility Berm Repair
Alteration
Results
Four Oaks, NC 27524

Ingrams Township Water District 2018-19 Hydraulic Improvements
Infrastructure
Results
Smithfield, NC

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Country Lane Residences
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Clayton, NC 27520

Jordan Narron Road Residential Subdivision
New Construction, Infrastructure
Conception
$10,600,000 CJ est. value
Selma, NC 27576

River Mews Estate
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Clayton, NC 27520

Clayton High School Auditorium
Addition, Demolition, Infrastructure - 17,800 SF
Bidding
$6,000,000 CJ est. value
Clayton, NC 27520

Last Updated 02/13/2023 04:39 PM
Project Title

NC 96 Four Oaks Economic Development Water Main Extension

Physical Address View project details and contacts
City, State (County) Smithfield, NC 27577   (Johnston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,724,038 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 10, 2022, construction is underway and expected to be completed by August, 2023. The work includes the installation of approximately 100 LF of 6", 25 LF of 12" and 6,530 LF of 16" water mains, air release valve assemblies, fire hydrant assemblies, 215 LF trenchless installations, miscellaneous valves and fittings and all other related work Bidder agreesthat the Work will be substantially complete within 270 calendar days after the date when the Contract Times commence to run Goals for minority Goals for 24.7 female participation for each trade participation for each trade % 6.9% *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents