Similar Projects
Last Updated | 02/17/2023 10:32 PM |
Project Title | 15th Avenue, Yellow River Bridge B-03-0217 |
Physical Address | View project details and contacts |
City, State (County) | Cameron, WI 54822 (Barron County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $815,878 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | State/Province: WI Project Category Code: Metal Fabrication, DOT Projects, Street/Roadway Reconstruction , Paving (Highway, Road or Street), Grade, Surface and Bridge, Grade and Surface, Bridge (Replacement or Rehabilitation), Traffic Control Devices (Signals, Signing, etc.), Erosion Control - Temporary, Paving (Asphalt or Concrete) Description: The Project consists of the replacement of the existing three span timber bridge P-03-0093 on 15th Avenue over the Yellow River with a two span steel tub girder bridge and includes minor roadway grading and restoration. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |