Similar Projects
Rice Lake - Spooner Construction / Pavement Replacement
Infrastructure
Design
$25,000,000 CJ est. value
Cameron, WI 54822

Rice Lake - Spooner Construction / Pavement Replacement
Infrastructure
Design
$25,000,000 CJ est. value
Cameron, WI 54822

Rice Lake Office Renovation
Infrastructure, Renovation
Bidding
$304,000 CJ est. value
Rice Lake, WI 54868

Rice Lake Office Renovation
Infrastructure, Renovation
Bidding
$304,000 CJ est. value
Rice Lake, WI 54868

Hospital Utility Extension
Infrastructure
Post-Bid
Cumberland, WI

Shouldering
Infrastructure
Post-Bid
Chetek, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

CTH M Bridge P-3-43
Results
$300,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

2023 Main Street Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Rice Lake, WI 54868

Local Road Improvement
Infrastructure
Post-Bid
$180,000 est. value
Turtle Lake, WI 54889

Odden Road and Odden Lane Improvements
Infrastructure
Results
Barronett, WI

Cedarcrest Ambulatory Surger Center and Clinic BP#2
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Rice Lake, WI 54868

2022 Road Work
Infrastructure
Post-Bid
$400,000 est. value
Almena, WI

Last Updated 02/17/2023 10:32 PM
Project Title

15th Avenue, Yellow River Bridge B-03-0217

Physical Address View project details and contacts
City, State (County) Cameron, WI 54822   (Barron County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $815,878 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

State/Province: WI Project Category Code: Metal Fabrication, DOT Projects, Street/Roadway Reconstruction , Paving (Highway, Road or Street), Grade, Surface and Bridge, Grade and Surface, Bridge (Replacement or Rehabilitation), Traffic Control Devices (Signals, Signing, etc.), Erosion Control - Temporary, Paving (Asphalt or Concrete) Description: The Project consists of the replacement of the existing three span timber bridge P-03-0093 on 15th Avenue over the Yellow River with a two span steel tub girder bridge and includes minor roadway grading and restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents