Similar Projects
Water Meters and Advanced Metering Infrastructure (AMI)
Post-Bid
Fairhaven, MA

Furnishing Ductile Iron Pipe, Hydrants, Hydrant Repair Kits/Parts, Gate Valves, Service Boxes, Corporations, Curb Stops, Gate Boxes, Polyethylene Tubing, Couplings, Hy Max Couplings, Transition Couplings, Repair Clamps, Service Saddles, Inserts and Thread Plugs
Post-Bid
Fall River, MA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Replacement Phase 19
Results
Less than $1,800,000 est. value
Fall River, MA 02722

Water Meter Replacement
Infrastructure
Post-Bid
North Dighton, MA

Fire Hydrants
Results
Seekonk, MA

Utilities Department Materials
Infrastructure
Post-Bid
Fall River, MA

Water Works Materials
Results
Seekonk, MA

FY2022 Cold Water Meters
Term Contract
Post-Bid
$150,000 est. value
South Easton, MA

Pond Street, Washington Street, and Prospect Street Water Main Improvements
Results
Less than $1,200,000 est. value
Easton, MA 02356

Water Meters With Reading System
Term Contract
Results
Less than $55,000 est. value
Westport, MA

King's Highway 12-Inch Water Main Replacement Project
Results
$1,058,600 est. value
New Bedford, MA

Construction of the Steere Street Water Main Replacement Project
Results
Less than $1,100,000 est. value
Attleboro, MA

Read Street Water Main Replacement Project
Results
Less than $2,200,000 est. value
Attleboro, MA 02703

Route 6 Pump Station Improvements and Sewer and Water Rehabilitation
Results
$1,000,000 est. value
Somerset, MA

Last Updated 10/21/2021 05:37 PM
Project Title

South Attleboro Pump Station Valve Replacement

Physical Address View project details and contacts
City, State (County) Attleboro, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $210,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

DCAMM Certification Required. The work includes bypass pumping and replacement of right 12-inch valves in the PS and one 16-inch valve in the yard outside of the PS.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents