Last Updated 02/01/2021 02:07 AM
Project Title

2021 Sturgeon Avenue Reconstruction and Water Main Contract No.2

Physical Address View project details and contacts
City, State (County) Midland, MI   (Midland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for street reconstruction and installation of water main on Sturgeon Avenue from Saginaw Road to Wackerly Street. The project scope includes water main installation, storm sewer modifications, removal and replacement of concrete walks, drives, and curb, crushing & shaping/cold milling existing bituminous pavement, placement of new bituminous pavement and turf establishment. 3,600 Ton Bituminous Pavement 4,100 L. Ft. 5” Curb & Gutter 5,000 L. Ft. 8”/12” D.I. Water Main

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents