Similar Projects
District Asphalt Work
Bidding
Layton, UT

I-15, 2600 South to Pages Ln (NB) Preservation High Volume
Bidding
$3,000,000 to $4,000,000 est. value
UT

Weber State Davis Campus Access Road
Post-Bid
Layton, UT 84041

Lot 4 at Hill AFB into a Fenced Material Storage Area.
Post-Bid
$5,000,000 to $10,000,000 est. value
UT

DDHU Lot 3 Repairs at Hill AFB, UT
Results
$5,000,000 to $10,000,000 est. value
Ogden, UT 84056

Storm Drain Improvements in Canyon Near Lacey Way
Results
$500,000 to $600,000 est. value
North Salt Lake, UT

Construction of the 400 East (Chase Lane to Parrish Lane) - Street Rebuild
Bidding
$450,000 est. value
Centerville, UT

Continental Drive Reconstruction Project
Post-Bid
Less than $690,000 est. value
Farmington, UT 84025

1300 North and 1000 West Roundabout Project
Results
$350,000 to $400,000 est. value
Clinton, UT 84015

DFCM Construction - Pre Qualified Paving - Davis Technical College Drive Paving Project
Bidding
$480,000 est. value
Kaysville, UT

400 East 540 North to Center Street Culinary Waterline
Post-Bid
$250,000 est. value
Centerville, UT

300 North Road Improvement Project
Results
Less than $1,600,000 est. value
West Point, UT 84015

1970 South 1200 West Street Construction Project
Bidding
Woods Cross, UT 84087

Construction of 625 West Waterline Replacement
Post-Bid
Bountiful, UT 84010

Bluff Road; 550 West (on Gentile) to 1000 West Reconstruct and Widening
Results
$3,000,000 to $6,000,000 est. value
UT

Last Updated 03/27/2020 11:58 AM
Project Title

Construction of the 800 West Improvement Project

Physical Address View project details and contacts
City, State (County) West Bountiful, UT 84087   (Davis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes the installation of 4500 ft. of 12" water line, 2000 ft. of storm drain pipe, concrete work, and 21,000 square yards of asphalt paving.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents