Similar Projects
2021 Safety Path Program
Infrastructure
Bidding
Bloomfield Hills, MI 48301

2021 Parking Lot Rehabilitation
Infrastructure
Bidding
Auburn Hills, MI 48326

BP 6 Birney Parking Lot and Track Field
Post-Bid
Southfield, MI 48076

CDBG ADA Sidewalk Ramp Installation
Post-Bid
Milford, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Innovation Hills Kayak Landing
Results
Rochester Hills, MI 48309

Brunkow Parking Lot Asphalt Project
Infrastructure
Bidding

2020 Safety Path Program
Post-Bid
MI

Municipal Parking Lot Maintenance Contract
Results
Less than $50,000 est. value
Novi, MI

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

FY 2019 CDBG Sidewalk Ramp Improvements
Results
Less than $36,785 est. value
Clawson, MI

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

2020 Sidewalk Replacement Program
Results
Less than $122,080 est. value
Berkley, MI

Woodland Elementary Sidewalk Replacement
Post-Bid
Auburn Hills, MI

Colfax CDBG Sidewalk Construction
Results
Farmington Hills, MI

Last Updated 09/03/2021 03:26 PM
Project Title

2021 Clinton River Trail Maintenance and Safety Improvements

Physical Address View project details and contacts
City, State (County) Pontiac, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work to be done under the Bid includes AASHTO compliant station grading and aggregate resurfacing along approximately 1.75 miles of existing trail from Pontiac Drive to Bagley Street. The project also includes striping and signage at all intersections, bollard removal and replacement, a High-Intensity Activated Crosswalk Beacon (HAWK) installation at the Orchard Lake Road crossing, wooden railing replacement at two existing bridges over the Clinton River, and ADA ramp improvements. Other items of work include soil erosion control, landscaping improvements, and maintenance of traffic.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents