Similar Projects
Board Up Contract
Term Contract
Post-Bid
Davenport, IA

Grant Wood Siding Replacement
Alteration
Post-Bid
Less than $250,000 est. value
Iowa City, IA 52240

Tipton Library Exterior Stair Replacement
Results
Tipton, IA 52772

ICCSD 2021 Buford Garner Wall Panel Replacement - Phase 2
Alteration
Results
$225,000 est. value
North Liberty, IA 52317

Treatment Center EIFS Replacement
Alteration
Post-Bid
Rockwell City, IA 50579

PCC Stair Reconstruction and Handrail Project
Alteration
Results
$24,500 est. value
Iowa City, IA

Ho-Chunk to Heritage Parking Ramp Skywalk Upgrades
Alteration
Post-Bid
Sioux City, IA 51101

Innovative Teaching and Technology Center Roof Replacement and Exterior Repairs
Alteration
Results
Less than $4,900,000 est. value
Cedar Falls, IA

City Hall Exterior Repairs Project
Alteration
Post-Bid
Davenport, IA

Cherry Hill Pool Caulking
Alteration
Results
Cedar Rapids, IA 52405

House Siding Replacement - Rathbun Wildlife Unit Headquarters
Alteration
Post-Bid
$90,000 est. value
Russell, IA 50238

DMPS Smouse Opportunity School Exterior Improvements
Alteration
Results
Des Moines, IA 50312

Rathbun HQ Roof and Gutter Repair
Alteration
Post-Bid
$30,000 est. value
Chariton, IA

DMPS Goodrell Middle School Exterior Restoration
Renovation
Results
Des Moines, IA 50317

Stanton Facade Improvements
Alteration
Post-Bid
$625,000 est. value
Stanton, IA 51573

Last Updated 05/05/2022 02:31 AM
Project Title

Dallas County Courthouse Exterior Repairs

Physical Address View project details and contacts
City, State (County) Adel, IA 50003   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Repair all damaged exterior stone masonry to match the design of the existing assembly and make a complete water tight system - to include patching, replacement with new material, and repoint all masonry joints. Other associated work includes: 1. Clean all exterior stone surfaces of the building, remove all biological and environmental staining. 2. Clean all exterior terracotta roof tile surfaces, remove all biological and environmental staining. 3. Movement fracture repair in stone. 4. Install lead joint covers on all horizontal joints in masonry. 5. All exterior wood surfaces shall be repaired or replaced with new wood. Existing wood surfaces to remain shall be scraped, and sanded; all exterior wood surfaces shall be primed, and painted. 6. Existing wood framed windows that are damaged shall be repaired or replaced. 7. Internal roof drains as indicated shall be lined using a cured in-place pipe (CIPP) restoration process. 8. Existing Gutter assemblies shall be removed, repaired, and replaced. Gutter assembly shall be lined with cold applied water proofing assembly. 9. Waterproof coating shall be applied to horizontal stone surfaces as indicated. 10. Apply a vapor permeable liquid moisture repellant product to all exterior stone surfaces. 11. Install complete UL rated Lightning Protection system. 12. Install new flashing at stone and roof intersections where missing. 13. Patch damaged portion of dome and scrape, and sand existing painted surface. Prime and repaint dome to match existing color. 14. Excavate perimeter exterior of building and apply exterior water proofing to existing foundation wall below grade. Install perimeter storm drain and backfill with granular fill.

Details

Division 09 - Finishes.
Division 10 - Specialties, Exterior Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents