Similar Projects
Address Pavement Condition
Infrastructure
Conception
$5,500,000 CJ est. value
Elizabethtown, KY 42701

Address Pavement Condition
Infrastructure
Conception
$3,250,000 CJ est. value
Elizabethtown, KY 42701

Address Pavement Condition of Wendell H. Ford Western KY Parkway
Infrastructure
Design
$9,200,000 CJ est. value
Eastview, KY 42732

Address Pavement Condition of Wendell H. Ford Western KY Parkway
Infrastructure
Design
$1,000,000 CJ est. value
Eastview, KY 42732

Radcliff Wastewater Treatment Plant Dewatering Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Radcliff, KY 40160

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Design - Architectural/engineering Services for the Construction of a New Facility
New Construction, Infrastructure
Post-Bid
$3,500,000 CJ est. value
Elizabethtown, KY 42701

Community and Technical College Student Center Site Work
Infrastructure
Results
$487,898 est. value
Elizabethtown, KY 42701

Fort Knox High School Soccer Field and Track Drainage Project
Infrastructure
Results
$234,000 CJ est. value
Fort Knox, KY 40121

BlueOvalSK Battery Park - Ford Motor Company
New Construction, Infrastructure - 8,600,000 SF
Construction
$5,800,000,000 CJ est. value
Glendale, KY 42740

New West Hardin Middle School - Hardin County Public Schools
New Construction, Infrastructure - 96,401 SF
Pending Verification
$36,000,000 CJ est. value
Cecilia, KY 42724

Address Pavement Condition on US-62
Infrastructure
Conception
$689,000 CJ est. value
Cecilia, KY 42724

Sage Springs
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Elizabethtown, KY 42701

Waterline Construction Materials
Infrastructure
Post-Bid
Elizabethtown, KY

Diecks Drive Street Improvements
Infrastructure
Results
$224,628 CJ est. value
Elizabethtown, KY 42701

Last Updated 07/24/2023 02:32 PM
Project Title

Contract 2 - BOSK & KCTCS Sanitary Sewer Improvements

Physical Address View project details and contacts
City, State (County) Elizabethtown, KY 42701   (Hardin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract 2 consists of the installation of new pumps at Lift Stations No.1 and No. 3, installation of an emergency generator at Lift Station No. 1, installation of a new wetwell and pumps at Lift Station No. 2, and associated appurtenances. All bidders shall submit with their bid a Bid Bond in amount of not less than five (5) percent of the base bid. No Bidder may withdraw his bid for a period of ninety (90) days after the scheduled Bid Opening Date. The Bidder awarded the contract shall execute a 100% Performance Bond and a 100% Payment Bond and shall furnish insurance as required, in the General Conditions. The Bidder awarded this contract shall complete this project within 120 calendar days after date of authorization to start work The Water District reserves the right to reject any and all bids and waive informalities This article covers the design and manufacture of ductile iron certrifugally cast on metal molds and ductile iron fittings. Specific Requirements: Ductile iron pipe shall be furnished cement lined unless otherwise noted on the Drawings or in other Sections of these Specifications. Ductile iron pipe shall be furnished with rubber gasket push on joints except as may otherwise be noted on the Drawings or in difficult working areas and with approval of the Engineer. If indicated, restrained joints may be required. 1. Pressure class shall be at least 250 psi for pipe sizes 20 inches or smaller and pressure class 200 psi for pipe sizes larger than 20 inches for mechanical and push on joint pipe. 15 2. Thickness design of ductile iron shall conform in all aspects to the requirements of ANSI/AWWA C150/A 21.50 latest revision. 3. Manufacture and testing of ductile iron pipe shall conform in all aspects to the requirements of ANSI/AWWA C151/A 21.51 latest revisions.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents