Similar Projects
Donora Sewer Rehabilitation Project
Post-Bid
Donora, PA 15033

Lower Yoder Sanitary/Storm Sewer Separation Project Phase III
Post-Bid
Johnstown, PA 15901

Twin Oaks Storm Sewer Piping Project
Results
Gettysburg, PA

2019 Blairsville Highway Turn Back Project Old Main Street and South Liberty Street
Results
Blairsville, PA

Whitebirch Road Extension
New Construction
Construction
Hazle Township, PA 18201

Cast Iron Frames and Grates
Post-Bid
Greensburg, PA 15601

Sanitary Sewer Manhole Rehabilitation Contract
Results
Less than $931,000 est. value
Pittsburgh, PA

Storm Structures for Rain Garden
Post-Bid
Allentown, PA

Brookwood/Park Terrace Stormwater Bmp Project
Results
Paxtang, PA

Parkview Storm Sewer Replacement
Post-Bid
Bellwood, PA 16617

Stormwater Improvements 18th, Vine, and Beech Streets
Results
New Florence, PA

2020-21 Waste Water and Stormwater Products
Term Contract
Post-Bid
Mechanicsburg, PA 17050

Repair the Storm Water Piping at North Allegheny Senior High School
Results
Wexford, PA

Bayard Street Storm Sewer Separation Phase 3 and 4
Post-Bid
Elizabeth, PA 15037

2019 South Avenue Area Sewer Rehabilitation Project - PH
Results
$450,000 to $500,000 est. value
Wilkinsburg, PA

Last Updated 01/08/2020 07:54 AM
Project Title

Construction of Green Stormwater Infrastructure

Physical Address View project details and contacts
City, State (County) Philadelphia, PA 19120   (Philadelphia County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Greater than $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Of Green Stormwater Infrastructure in E Godfrey St., Newtown Ave. to Colgate St. Weymouth St., E Sanger St. to Cheltenham Ave. Reach St., E Sanger St. to Cheltenham Ave. E Sanger Street, Reach St. to Hasbrook Ave. Hasbrook Ave., E Sanger St. to Sentner St. Hasbrook Ave., Cheltenham Ave. to Van Kirk St. Cheltenham Ave., Hasbrook Ave. to Colgate St. Sentner St., Hasbrook Ave. to Colgate St. Alcott St., Hasbrook Ave. to Rising Sun Ave. Van Kirk St., Hasbrook Ave. to Rising Sun Ave. Howell St., Hasbrook Ave. to Rising Sun Ave. Colgate St., E Godfrey Ave. to Van Kirk St Allengrove St., E Godfrey Ave. to Bingham St. Bingham St., Dead End To Allengrove St.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents