Similar Projects
North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Design
$100,000,000 est. value
Arlington, VA

North Section Rehabilitation - NP-GWMP 1(3), 2(5)
Design
$100,000,000 est. value
Arlington, VA

Route 301 Pine Hill Creek Scour Repairs
Renovation, Infrastructure
Bidding
$590,000 est. value
King George, VA

SGR/Smart Scale - RTE 33 Bridges Over I81 and NSRR Replacement
Renovation, Infrastructure
Bidding
$61,103,000 est. value
Harrisonburg, VA 22801

Freeman Store Pedestrian Bridge
Post-Bid
$500,000 to $749,999 est. value
Vienna, VA 22180

Heat Straightening Bridge Maintenance Services
New Construction
Post-Bid
McLean, VA 22067

Deep Creek Bridge Replacement
Results
$25,000,000 to $100,000,000 est. value
Chesapeake, VA

Deer Park Footbridge Replacement
Results
Newport News, VA 23607

Churchland Bridge Replacement Project
Construction
$29,500,000 est. value
Portsmouth, VA 23701

Rehabilitate Colonial Parkway, Phase 1 Colonial National Historical Park
Renovation, Infrastructure
Design
$100,000,000 to $150,000,000 est. value
Williamsburg, VA 23185

Modular Bridge for Route 710
New Construction, Infrastructure
Bidding
Alleghany, VA 24426

Emergency Span Drive
New Construction, Term Contract, Infrastructure
Post-Bid
Hampton, VA

West Glebe Road Bridge
Results
$6,500,000 to $12,000,000 est. value
Arlington, VA

Richmond Movable Bridge
New Construction, Term Contract
Bidding
Richmond, VA

Upgrade To Its Bridge #117 Located At Mile Post 7.87
Renovation
Post-Bid
VA

Reported 06/09/2022 12:00 AM
Project Title

Bridge Repairs and Miscellaneous Enhancements, Dulles Toll Road (DTR)

Physical Address View project details and contacts
City, State (County) Dulles, VA 20102   (Loudoun County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 to $3,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Goal - 30% Local Disadvantaged Business Enterprise (LDBE) participation requirement. The Contractor shall repair and restore 15 deteriorated bridges along the Dulles Toll Road (DTR), perform repairs at the Dulles Toll Road Main Toll Plaza Tunnel and install an overheight detection system located below the westbound Dullest Toll Road bridge at Reston Parkway.

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents