Similar Projects
Sump Pump Replacement at MCF - Moose Lake
Bidding
Moose Lake, MN

High Service Pump 4 & Backwash Pump 11 Rehabilitation
Post-Bid
$105,000 est. value
Lakeville, MN

Wells 10 & 12 Rehabilitation
Post-Bid
$160,000 est. value
Lakeville, MN 55044

Municipal Well No. 5 & DNR Compliance (Monitoring) Well
Results
Carver, MN

Capping the West Well
Results
Rochester, MN 55906

2021 Booster Pump Nos. 4 and 5 Improvements
Post-Bid
Anoka, MN

By-Pass Pumping
Results
Minneapolis, MN

Supernatant Pump and Provide Training
Post-Bid
Minneapolis, MN

WWTF Pump and Diffuser Improvements
Results
Less than $1,750,000 est. value
New Ulm, MN

DNR2 Hill Annex Observation Well Drilling
Post-Bid
$368,000 est. value
Calumet, Marble, MN

Sewer Pump Replacement
Renovation
Results
Bemidji, MN 56601

Horse Camp Well Pump Replacement
Post-Bid
Spring Valley, MN 55975

Hill Annex Observation Well Drilling
Term Contract
Post-Bid
Calumet, Marble, MN

Mystery Cave State Park - Well Pump
Renovation
Post-Bid
Spring Valley, MN 55975

Knowlton Creek and Scanlon Grating Replacement
Post-Bid
Duluth, MN

Last Updated 02/15/2021 05:46 AM
Project Title

2021 Well Rehabilitation

Physical Address View project details and contacts
City, State (County) Anoka, MN   (Anoka County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Major components of the Work include: Remove pumping equipment, rehabilitate well, and repair/replace equipment at three (3) wells (Well Nos. 19, 22, & 23) with vertical turbine pumping equipment. Well 19: 133.58 feet deep, pump setting 83.58 feet below grade. Well 22: 104.5 feet deep, pump setting 73.5 feet below grade. Well 23: 123.58 feet deep, pump setting 85 feet below grade. Add/upgrade Process instruments to City uniformity standards at each well. Magnetic Flow Meters with I/O (Badger). Downhole pressure transducer with I/O (PMC). Digital pressure gauge with I/O (Rosemount). AVK Swing Check Valve. Smooth nose sample tap. Clean and paint process equipment and piping. Add/upgrade Butterfly Valve at Well #22 & #23.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents