Similar Projects
Last Updated | 02/15/2021 05:46 AM |
Project Title | 2021 Well Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Anoka, MN (Anoka County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Major components of the Work include: Remove pumping equipment, rehabilitate well, and repair/replace equipment at three (3) wells (Well Nos. 19, 22, & 23) with vertical turbine pumping equipment. Well 19: 133.58 feet deep, pump setting 83.58 feet below grade. Well 22: 104.5 feet deep, pump setting 73.5 feet below grade. Well 23: 123.58 feet deep, pump setting 85 feet below grade. Add/upgrade Process instruments to City uniformity standards at each well. Magnetic Flow Meters with I/O (Badger). Downhole pressure transducer with I/O (PMC). Digital pressure gauge with I/O (Rosemount). AVK Swing Check Valve. Smooth nose sample tap. Clean and paint process equipment and piping. Add/upgrade Butterfly Valve at Well #22 & #23. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |