Similar Projects
Maple and Walnut Streets Sanitary and Storm Sewer Improvements
Bidding
Glens Falls, NY

Maple & Walnut STS Sanitary and Storm Sewer Improvements
Bidding
Glens Falls, NY 12801

Precast Catch Basins, Dry Wells, Frames and Covers
Post-Bid
Ballston Spa, NY 12020

Sewer System Improvements
Post-Bid
Fonda, Fultonville, NY 12072

Storm Sewer Upgrades and Green Infrastructure Improvements
Results
Fort Plain, NY

Westside Ballston Lake Sewers - Contract 2
Results
Less than $3,500,000 est. value
Ballston Lake, NY 12019

Storm Water Drainage System Yearly Construction and Reconstruction Program 2021
Term Contract
Bidding
Latham, NY

Precast Manholes
Term Contract
Post-Bid
Delmar, NY 12054

Pothole and Catch Basin Repairs
Results
Spring Valley, NY 10977

Storm Drain Pipe (2021-2022)
Term Contract
Bidding
NY

Purchase of Sewer Frames and Grates
Post-Bid
Yonkers, NY 10701

Channel Daylighting and Riparian Improvements
Results
Middletown, NY 10941

Provide Asphalt Pavement and Drainage System at Building 130
Bidding
Brentwood, Islip, NY 11717

Automated Stormwater Storage Control and Monitoring Services and Equipment
Term Contract
Post-Bid
Albany, NY 12207

Catch Basin and Construction-Term Construction Contract (TCC 1)
Results
Rochester, NY 14614

Last Updated 12/12/2019 09:33 AM
Project Title

Ballson Lake Sewer District Sewer Project - Contract 1 and 5

Physical Address View project details and contacts
City, State (County) Ballston Lake, NY 12019   (Saratoga County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value $3,325,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 1 - Buell Heights and Main Street Areas - $3,200,000 A. Contract # 1 consists of the installation of new sewer facilities and systems for the Buell Heights and Main Street areas of the Ballston Lake Sewer District. B. The scope of work includes, but is not limited to, furnishing and installing approximately 13,000 linear feet of 8” and 12” diameter PVC gravity sewers, manholes, gravity service laterals, 1,400 linear feet of low pressure sewers and force mains, and the Main Street Pumping Station complete with appurtenant work and restoration. Contract No. 5 Electrical - $125,000 Contract #5 consists of furnishing and installing all of the electrical components in the Main Street Pump Station. Contract #5 shall include furnishing and installing all of the control wire and conduit with the general contractor making the final terminations to the instrumentation and control panels. Contract #5 shall also furnish and install conduit, conductors, lights, unit heaters, receptacles, automatic transfer switches, panel boards, transformers and disconnect switches. A diesel generator and auto transfer switch shall be installed at the pump station. Coordinate with National Grid to furnish and install new electrical service.

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 11 - Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Raceway and Boxes for Electrical Systems, Packaged Generator Assemblies, Transfer Switches, Automatic Transfer Switches, Lighting.
Division 31 - Earthwork, Excavation and Fill, Excavation, Trenching.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents