Similar Projects
Last Updated | 12/28/2020 09:46 AM |
Project Title | Construction of Pump Stations 2, 3, 4, and 5 Electrical Upgrades |
Physical Address | View project details and contacts |
City, State (County) | Berlin, MD 21811 (Worcester County) |
Category(s) | Sewer and Water, Single Trades |
Sub-Category(s) | Electric, Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construction of Pump Stations 2, 3, 4, & 5 Electrical Upgrades for the Worcester County Department of Public Works – Water and Wastewater Division. The Project generally consists of relocating the existing electrical power distribution and controls system equipment from the existing dry pit below grade to a new location above grade. The new SCADA Pump Control Panel, provided by the County, will be installed on a concrete equipment pad at each pump station. The existing power distribution equipment within the existing enclosure located above grade shall be upgraded. The remaining upgrades for the four pump stations will also consist of wet well modifications, wiring, conduits, equipment upgrades, testing, start-up, site restoration and closeout, and includes furnishing all equipment, material, and labor for the work described in the bid document drawings and specifications |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |