Similar Projects
Replace Grid Ceiling and Lighting In Four Hallways of Haley Academic Building
Post-Bid
Less than $135,000 est. value
Gardner, MA 01440

Interior Alterations for COVID-19 Protocol Public Service Window
Post-Bid
Less than $35,000 est. value
Athol, MA 01331

Kitchen Cabinet Replacement
Results
$49,000 est. value
Southborough, MA 01772

Ceiling Replacement at South Street Elementary School
Results
$16,800 est. value
Fitchburg, MA 01420

4th Floor Entrance
Alteration
Post-Bid
$21,296 est. value
Fitchburg, MA 01420

Furnishing and Installation
Results
Less than $135,000 est. value
Worcester, MA

Acoustic Panel Install at Legislative Building
Alteration
Post-Bid
Fitchburg, MA 01420

Student Center Accessibility Renovations
Results
$125,000 est. value
Worcester, MA 01602

Kitchen Cabinet Replacement
Alteration
Post-Bid
$49,000 est. value
Southborough, MA 01772

Temporary Space Modification
Results
Leominster, MA 01453

Kitchen and Flooring Upgrades Phase 2
Results
$46,000 est. value
Athol, MA 01331

Renovate Shower Room
Results
$32,444 est. value
Grafton, MA 01536

Public Safety Complex Partial Lobby Renovation
Results
$49,980 est. value
Sturbridge, MA 01566

Administration Building Suspended Ceilings
Results
$13,900 est. value
Worcester, MA

Kitchen Renovations at the Morton Meadows 667-1 Development
Results
$65,510 est. value
Athol, MA 01331

Reported 03/12/2022 12:00 AM
Project Title

Repairs to First Floor Ceilings

Physical Address View project details and contacts
City, State (County) Douglas, MA 01516   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Greater than $50,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Repairs to first floor ceilings, Simon Fairfield Public Library at 290 Main Street, Douglas. Hanging wallboard, plastering, all necessary materials and work to protect building interior and contents during project. Minor electrical work to remove and restore fixtures before and after project.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents