Similar Projects
Partition Wall Maintenance and Repair
Term Contract
Bidding
Fort Worth, TX 76102

Z--763-19-1-328-0011 Logistics & QA Office Finish - Dallas CMOP
Build-Out
Post-Bid
$25,000 to $100,000 est. value
Lancaster, TX 75134

PUF FY16 Repair Loose Guardrail
Post-Bid
$210,000 est. value
San Antonio, TX

Waco Ceiling Finishes
Results
TX

NC Interior Load Bearing Wall Renovations
Results
$40,000 to $50,000 est. value
Galveston, TX

Vandegrift High School Secure Vestibule
Construction
Austin, TX 78750

Operable Partitions for Pasadena Convention Center
Post-Bid
Pasadena, TX 77507

Exhibit Design, Fabrication, and Installation Services
Results
Austin, TX

Suspended Ceiling Specialist
Post-Bid
Grapeland, TX 75844

John Peace Library (JPL) Column Repair and Related Work
Results
$39,500 est. value
San Antonio, TX

Ceiling Tile
Post-Bid
Houston, TX 77002

Benton Ceiling Repairs and Move In Ready
Results
Waco, TX 76700

Fine Arts Building - Water Intrusion Repairs
Post-Bid
Houston, TX

Starc Portable Modular Wall System
Results
$65,233 est. value
Plano, TX

Ceramic/Base Board Installation-Municipal Housing (Property: 526-B Sequoia Lane
Post-Bid
Laredo, TX 78041

Reported 12/21/2018 12:00 AM
Project Title

Gala Staging

Physical Address View project details and contacts
City, State (County) Austin, TX   (Travis County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description Include all rentals, shipping, delivery and labor charges for setup (X-2). All structures must be self-supporting from the floor with no additional supports or tethers. Nothing can be anchored to walls, ceilings or floors. Preference given to vendor with national offices.Dark, large ballroom and theater. Additional lighting and lit staging elements will be crucial to visual impact. Recommendations for internal, backlit or spotlighting should be included for each element as part of the stage design/estimate for both events. A. 13.5'x28', QTY 1: will repeat for PEF (April 4) B. 10'x10' or 8'x10', QTY 1: will repeat for PEF (April 4) C. 8' or 10' height (to match B), QTY 2: will need custom graphic for each event
Details
Division 09 - Finishes.
Division 12 - Furnishings.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents