Similar Projects
Last Updated | 06/06/2019 09:00 AM |
Project Title | Lift Station No. 9 Improvements |
Physical Address | View project details and contacts |
City, State (County) | Palm Beach Gardens, FL (Palm Beach County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $157,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project entails the construction, testing and restoration work associated with the installation of an 8-inch DR-14 C-900 PVC bypass under the eastbound lane of Burns Rd. from the Burns Rd. median to Lift Station No. 9 with vaults and camlock assemblies at each end of the 8-inch PVC bypass. Additionally, this project includes improvements at Lift Station No. 9 including new 8-inch stainless steel discharge riser piping, new black vinyl-coated chain link fence and gates with privacy slats, new corrosion barriercoating of the existing wet well, new 6-inch concrete housekeeping slab, new 1-inch water service and backflow preventer, cleaning and recoating of the existing 8-inch above-grade discharge piping, pressure washing of the existing wet well concrete top slab, and all other work | ||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |