Similar Projects
Lift Station 53 Improvements
Bidding
Less than $350,000 est. value
West Palm Beach, FL 33407

Lift Station No. 153
Post-Bid
Less than $400,000 est. value
West Palm Beach, FL 33411

Lift Station Rehabilitation Project - Bid Package 2
Post-Bid
FL

Abandonment of Kent Pump Station (PS-05)
Results
Less than $802,000 est. value
Palm Springs, FL

Lift Station 5, 39, 41,44,74, 85 Rehabilitation
Results
Less than $1,730,500 est. value
Wellington, FL

E-3, E-4 and G-9 Wastewater Pump Station Improvements
Results
Less than $2,000,000 est. value
Palm Beach, FL

Lift Station Rehabilitation
Results
Jupiter, FL

Lift Station Rehabilitation for Fountainview, Mediterranean and Woodlands
Results
Palm Springs, FL

Wastewater Pump Station No. 15 and 21 Improvements
Results
Lake Worth, FL

Lift Station No. 26, 45 and 51 Rehabilitation
Results
Less than $2,750,000 est. value
West Palm Beach, FL

Unit No. 53 Arden – Parcels K and E-South Public Improvement Project
Results
Palm Beach Gardens, FL

E-2 Lift Station Improvements
Results
Palm Beach, FL

E-1 Lift Station Improvements
Results
Less than $350,000 est. value
Palm Beach, FL

Water Treatment Plant No. 11 High Service Pump Station Electrical Building Improvements
Results
West Palm Beach, FL 33416

Lift Station 74 and 75 Improvements
Results
$1,250,000 est. value
West Palm Beach, FL

Last Updated 06/06/2019 09:00 AM
Project Title

Lift Station No. 9 Improvements

Physical Address View project details and contacts
City, State (County) Palm Beach Gardens, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $157,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Project entails the construction, testing and restoration work associated with the installation of an 8-inch DR-14 C-900 PVC bypass under the eastbound lane of Burns Rd. from the Burns Rd. median to Lift Station No. 9 with vaults and camlock assemblies at each end of the 8-inch PVC bypass. Additionally, this project includes improvements at Lift Station No. 9 including new 8-inch stainless steel discharge riser piping, new black vinyl-coated chain link fence and gates with privacy slats, new corrosion barriercoating of the existing wet well, new 6-inch concrete housekeeping slab, new 1-inch water service and backflow preventer, cleaning and recoating of the existing 8-inch above-grade discharge piping, pressure washing of the existing wet well concrete top slab, and all other work
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents