Similar Projects
Valley Tennis Court Resurfacing Project
New Construction, Infrastructure
Bidding
Less than $30,000 est. value
Lexington, MA

Design and Installation of an Outdoor Educational Challenge Course
New Construction
Bidding
Marlborough, MA 01752

Walsh Field Improvement
Post-Bid
$570,000 est. value
Framingham, MA 01702

Park Improvements for Gertrude Spaulding Park
Post-Bid
Less than $150,000 est. value
Wakefield, MA 01880

Tennis Court Replacement at War Memorial Recreation Center
Results
$435,000 est. value
Cambridge, MA 02138

Ferryway Tot Lot Surfacing
Results
$65,000 est. value
Malden, MA

Mary Cummings Park Improvements
Renovation
Construction
$400,000 est. value
Burlington, MA 01803

Green at UTEC
New Construction
Construction
Lowell, MA 01852

Manchester Field 400M Running Track Repair and Resurfacing Project
Post-Bid
Less than $135,000 est. value
Winchester, MA 01890

Cold Spring Park - Life Course Trail Renovation
Results
$65,000 est. value
Newton, MA

Pocket Park Improvement and Maintenance of Cobble Traffic Islands
Post-Bid
$25,000 est. value
Lincoln, MA

Bocce Court Installations - Saltonstall Building
Results
Less than $58,000 est. value
Medford, MA 02155

Ronan McElligott Playground Safety Surfacing
Post-Bid
Westford, MA

Infield Renovations Monsignor McCabe Playground and Nipper Maher Park
Results
Waltham, MA

Steele Playground Renovations
Post-Bid
$290,000 est. value
Stoneham, MA 02180

Last Updated 06/04/2021 10:08 AM
Project Title

South Campus Weed Plaza Improvements

Physical Address View project details and contacts
City, State (County) Lowell, MA 01854   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: The project involves improvements to the South Campus plaza on the north side of Weed Hall, including new plantings, pavement and concrete walkways as well as new covered bicycle parking structures. An 8-inch fire protection water main shall also be installed within the improved plaza. The project also involves the installation of new covered bicycle parking structures at the North Campus quad.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents