Similar Projects
Exterior Grounds Landscape and Maintenance Services (Off-Airport) Services
Post-Bid
Atlanta, GA 30303

T-32 - Landscape Maintenance of RAs and WCs
Post-Bid

Remove Hazardous Trees
Results
Kennesaw, GA 30152

Annual Contract - Tree/Limb Removal and Trimming
Term Contract
Results
GA

Supplemental Landscaping Service
Post-Bid
Less than $75,000 est. value
Kennesaw, GA 30152

Tree Survey Off Base Properties Dobbins ARB
Results
Marietta, GA 30067

Procurement of Interior Landscaping Services
Post-Bid
Atlanta, Decatur, GA 30324

Provide Landscape Service
Results
Atlanta, GA 30312

Landscape Services for Confederate Cemeteries at Cassville, Jonesboro, Kingston, Marietta, Milner and Resaca
Post-Bid
Cassville, Jonesboro, Kingston, Marietta, Milner, Resaca, GA

Tank Site Area Landscape Maintenance Service
Term Contract
Results
Alpharetta, Johns Creek, Roswell, Sandy Plains, GA 30075

Tree Removal Services
Post-Bid
Marietta, GA 30060

Lawncare Services
Term Contract
Post-Bid
Dallas, Douglasville, Hiram, Powder Springs, Rockmart, Temple, Villa Rica, GA 30157

Whitlock Avenue Median Landscape Installation
Post-Bid
Marietta, GA 300610609

Design/Build Group B2 Track and Turf Installation
Post-Bid
Atlanta, Decatur, Lithonia, Stone Mountain, GA 30319

Supplemental Landscaping Services
Post-Bid
Less than $75,000 est. value
Kennesaw, GA 30152

Reported 03/04/2020 12:00 AM
Project Title

188 MLK Building, Soccer Field Turf

Physical Address View project details and contacts
City, State (County) Atlanta, GA   (Cobb County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Laser grade sub-grade to within 1/4" tolerance through the use of fully automated hydraulically actuated, laser guided equipment. 2. Install Soccer sleeves necessary for Kwik Goal Soccer Goals 3. Install 12" N-12 perforated double smooth-wall pipe collector line and tie into storm drainage system 4. Install 4" N-12 perforated double smooth-wall pipe laterals 30' on centers encased in gravel. 5. Install Geo-textile on surface of sub-grade and walls of ditches 6. Install a new irrigation system with 100% head to head coverage to tie into existing system 7. Install a Manifold Concrete Vault for Irrigation Controls & HDPE Manifold 8. Pace and Install 6” of USGA Sand(No Peat) for the Rootzone Profile 9. Provide all necessary #57 stone for the perimeter of field where turf apron will go 10. Install a synthetic apron around field using recycled synthetic turf 11. Install Certified Bermuda 42” Sod rolls

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents