Similar Projects
Bush's Chicken - N. 19th St / Waco
New Construction, Infrastructure - 3,759 SF
Design
Less than $925,000 est. value
Waco, TX 76708

Bush's Chicken - N. 19th St / Waco
New Construction, Infrastructure - 3,759 SF
Design
Less than $925,000 est. value
Waco, TX 76708

2022 Mill and Overlay, Phase 2 District 4
Infrastructure
Bidding
$1,900,000 to $3,200,000 est. value
Waco, TX 76701

Intersection Improvement
Infrastructure
Bidding
$480,706 est. value
Waco, TX

2021 31st and Gurley Street Improvements Project
Infrastructure
Post-Bid
Beverly Hills, TX 76711

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Entrance Sidewalk Modifications
Results
Waco, TX 76710

Cameron Park Zoo Overflow Parking Lot
Results
$312,000 est. value
Waco, TX 76707

IH 35 - Resurface Roadway
Infrastructure
Bidding
$791,881 est. value
Waco, TX 76700

Parking Lot and Paving Improvements Spring Valley Elementary School
Infrastructure
Post-Bid
Hewitt, TX 76643

Upgrade MBGF
Results
$2,061,975 est. value
TX

2022 Street Repair of Chihuahua Street and River Road. Intersection, and Preservation of Lauren Court, Hillcrest Drive, and Kyle Street
Infrastructure
Bidding
$700,000 est. value
La Vernia, TX

ITC/Welding Parking Repave
Infrastructure
Post-Bid
$100,000 est. value
Waco, TX 76705

Waco Parking Lot Repair
Results
$72,500 est. value
Waco, TX 76705

2022 Micro-Surfacing Improvements
Infrastructure
Post-Bid
$3,000,000 est. value
Woodway, TX 76712

Last Updated 07/12/2022 11:04 PM
Project Title

Bellmead Drive Streetscaping Improvements

Physical Address View project details and contacts
City, State (County) Bellmead, TX 76705   (McLennan County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall replace sidewalks in the Downtown District to improve pedestrian safety and eliminate existing conditions of slums or blight. Contractor shall install approximately one thousand six hundred linear feet (1,600 l.f.) of concrete sidewalk, nineteen (19) ADA accessible curb ramps, thirteen (13) streetlights, eleven (11) decorative concrete crosswalks utilizing three thousand two hundred eighty square feet (3,280 s.f.) of material, and all associated appurtenances. All questions must be submitted in writing through electronically Question and Answer feature. For more information, contact Amy Jo Moreno at (254) 714-1402 or amoreno@walkerpartners.com 1. Concrete sidewalk 2. Accessible curb ramps 3. Decorative pedestrian crossings 4. Street lights Stormwater Pollution Prevention Plan Remove and Replace Brick Pavers Remove Existing Concrete Concrete Sidewalk Install Decorative Crosswalk Relocate Existing Signage Antique Acorn Street Light 1" Conduit Connect to Existing Power

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents