Similar Projects
C--Bridge Inspection and Assessment Worldwide
Results
$10,000 to $10,000,000 est. value

C--Bridge Inspection and Assessment Worldwide
Results
$10,000 to $10,000,000 est. value

Last Updated 10/18/2021 02:30 PM
Project Title

H146--CTX Chemical Treatment

Physical Address View project details and contacts
City, State (County) Temple, TX 76504   (Bell County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Chemical Delivery and Inspections The contractor shall furnish all chemicals needed to treat cool water and hot water closed loop systems/Cooling Towers: i. Cooling Tower scale and corrosion inhibitor. ii. Biological dispersant/polymer/silt control iii. Hypochlorite oxidizing biocide. iv. Closed loop corrosion inhibitor (hot and chill). v. Hot water loop treatment cleaner. vi. Heating water loop inhibitor. vii. Inspect closed cool water and hot water loop systems. 2. Contractor will install chemicals into the closed loop systems monthly and test them for debris. 3. Contractor will also flush debris after chemicals are installed to clean the closed loop systems.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents