Similar Projects
Waterfield Bldg Ceiling Modernization
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
Norfolk, VA 23510

Building 30 Chiller, Pumps and Data Air Replacement Project
Alteration
Bidding
Virginia Beach, VA

HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC and Mechanical Products
Term Contract
Post-Bid

ORF HVAC Renovation
Alteration
Results
Norfolk, VA

Wells Theater Cooling Tower Replacement
Alteration
Results
Norfolk, VA 23510

Central Plant - Building 12 Cooling Tower 3 Replacement
Alteration
Bidding
$70,000 est. value
Virginia Beach, VA

EVMS Lewis Hall HVAC Modifications of Cast Lab
Term Contract
Post-Bid
Norfolk, VA

Rogers and Gresham HVAC Replacement
Renovation, Alteration - 155,578 SF
Results
Norfolk, VA 23508

Building SP-301 HVAC Replacement, Naval Station Norfolk
Alteration
Bidding
$250,000 to $500,000 est. value
Norfolk, VA 23511

HVAC Upgrade at Acosta Building
Post-Bid
Norfolk, VA 23505

Crittenton Hall HVAC Upgrades
Alteration
Results
Norfolk, VA 23508

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Services- DMV Norfolk Military Circle CSC
Term Contract
Results
Norfolk, VA 23502

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Last Updated 04/27/2022 09:26 AM
Project Title

Replace HVAC, Bldg SP-366

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will replace the dated HVAC system with a new HVAC system for building SP-366, Naval Station Norfolk, Norfolk, VA. The project will demolish existing air handlers, ductwork, controls, air exhaust system, steam and condensate piping in the mechanical room. Heating water pumps, exhaust fans, and actuators will be replaced. Existing concrete pads will be replaced in the mechanical room. SAPC system on the second floor will be replaced and rooftop flashing at exhaust fan locations will be replaced as needed. Carbon monoxide detectors, fire dampers, and duct detectors will be provided where required. Electrical equipment to AHU-1/AHU-2 and exhaust fans on the roof will be replaced. Second floor lighting will also be replaced.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents