Similar Projects
Rehabilitate Parking Lot
Infrastructure
Bidding
$500,000 to $1,000,000 est. value
Albany, NY 12229

Resurfacing of Wehrle Drive from Harlem Road (NYS 240) to Aero Drive
Infrastructure
Bidding
Amherst, NY

2020 J. H. Ketcham Memorial Park Driveway and ADA Parking
Post-Bid
Dover Plains, NY 12522

Reconstruction of the Rye Town Park Beach Ramps
Post-Bid
Rye, NY 10580

Liberty Street Streetscape and Sidewalk Improvements
Results
Newburgh, NY 12550

Plotter Kill Preserve Improvement
Results
Schenectady, NY 12305

ADA Entry and Ramp
Infrastructure
Pending Verification
Port Jefferson, NY 11777

Pedestrian Safety Improvement Project
Infrastructure
Bidding
Suffern, NY

Central 5 Parking Lot ADA Asphalt
Post-Bid
Harrison, NY 10577

Beekman Avenue Pedestrian Improvements - PIN Nos. 8761.15 and 8761.50
Results
Sleepy Hollow, NY 10591

Quackenbush Square Site Improvements
Infrastructure
Bidding
Albany, NY

2021 ADA Replacement
Post-Bid
Binghamton, NY

Paving Project - Parking Lots 7A and 7B with Retaining Wall
Results
Middletown, NY 10940

Hudson River Valley Greenway Grant - North County Trailway Connection
Infrastructure, Alteration
Bidding
Briarcliff Manor, NY 10510

Babbitt Road Sidewalk Improvements
Post-Bid
Bedford Hills, NY 10507

Reported 02/12/2022 12:00 AM
Project Title

Saratoga Greenbelt Downtown Connector Trail

Physical Address View project details and contacts
City, State (County) Saratoga Springs, NY 12866   (Saratoga County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project will provide a 1.6-mile trail that begins at the intersection of Lake Avenue/High Rock Avenue and ends at the existing trail terminus on Excelsior Avenue. The project will construct a 10-foot-wide multi-use path on the north side of the roadways. It will also reconstruct the High Rock Avenue/Excelsior Avenue/Warren Street intersection so that both Warren Street and the High Rock Avenue spur intersection the mainline at ninety-degree angles and are stop controlled. The mainline will operate under a free-flow condition. As a result of the trail/intersection construction there will be improvements to storm drainage, the Excelsior Avenue/East Avenue signal, roadway striping and landscaping. The project will also construct segments of sidewalk to connect the existing network located primarily on the south side of the roadways. Miscellaneous appearances such as benches, wayfinding signage, bike racks will be installed to support the trail.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents