Similar Projects
Enhance Pedestrian and Bike Facilities along Main Street - Town of Clifton Park
Infrastructure
Conception
$1,781,000 est. value
Clifton Park, NY

Polyset Expansion
Addition, Infrastructure - 24,500 SF
Conception
$1,250,000 CJ est. value
Mechanicville, NY 12118

One-Four-Six Marketplace
New Construction, Infrastructure - 151,000 SF
Design
$140,000,000 CJ est. value
Halfmoon, NY 12118

Waite Meadows
New Construction
Design
NY

The Riverview Apartments
New Construction, Infrastructure - 66,100 SF
Bidding
$6,000,000 CJ est. value
Corinth, NY 12822

General Excavation Services
Infrastructure
Post-Bid
Ballston Spa, NY

Cold Milling Work Order Contract
Term Contract, Infrastructure
Post-Bid

Old Post Road and Route 9 Intersection Improvement Project
Results
Malta, NY

Hudson-Mohawk Trail Resurfacing Improvements
Infrastructure
Results
$765,300 to $1,035,400 est. value
Saratoga Springs, NY

Tait Lane Reserve
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Tait Lane Reserve
New Construction, Infrastructure
Construction
$80,000,000 CJ est. value
Saratoga Springs, NY 12866

Chick-fil-A / Clifton Park
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Clifton Park, NY 12065

Chick-fil-A / Clifton Park
Demolition, New Construction, Infrastructure - 14,000 SF
Pending Verification
$1,000,000 CJ est. value
Clifton Park, NY 12065

Starting Gate Farm & Winery
New Construction, Infrastructure - 15,000 SF
Conception
$5,900,000 CJ est. value
Ballston Spa, NY 12020

West Avenue Mixed-Use
New Construction, Infrastructure - 4,039 SF
Design
$1,100,000 CJ est. value
Saratoga Springs, NY 12866

Last Updated 03/10/2023 12:35 PM
Project Title

Tribley Active Adult Community PDD

Physical Address View project details and contacts
City, State (County) Mechanicville, NY 12118   (Saratoga County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 22, 2023, this project is under construction. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents