Similar Projects
Southwest Water Treatment Plant - U22SWT - City Of North Port
New Construction, Infrastructure
Conception
$21,000,000 CJ est. value
North Port, FL 34287

Replace 10" AC Force Main From Liftstation #39 To Floyd/School Avenue - 002637 - City Of Sarasota
Infrastructure
Conception
$2,150,000 CJ est. value
Sarasota, FL 34237

Whitaker Lofts
New Construction, Infrastructure - 24,096 SF
Design
$11,400,000 CJ est. value
Sarasota, FL 34236

Villa Ballada
New Construction, Infrastructure - 1,500 SF
Design
$8,700,000 CJ est. value
Sarasota, FL 34236

2022 Water Distribution Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
North Port, FL 34287

2022 Water Distribution Improvements
Infrastructure
Bidding
$2,000,000 CJ est. value
North Port, FL 34287

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

PVC Pipe
Term Contract
Post-Bid
FL

Construction Services for Laurel Road Community Development
Results
FL

Small Water Meter Replacement Program
Term Contract
Results
$2,500,000 est. value
FL

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Pines of Sarasota Senior Living Facility
New Construction, Infrastructure
Construction
$120,000,000 CJ est. value
Sarasota, FL 34236

Four Points by Sheraton / Sarasota
Addition, Infrastructure, Renovation
Pending Verification
$10,000,000 CJ est. value
Sarasota, FL 34239

Four Points by Sheraton / Venice
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Venice, FL 34239

Replace 14" AC Force Main From Liftstation #31 To South Washington Drive - 002638 - City Of Sarasota
Infrastructure
Conception
$825,000 CJ est. value
Sarasota, FL 34237

Last Updated 10/27/2022 11:37 AM
Project Title

2021 Water Distribution System Improvements

Physical Address View project details and contacts
City, State (County) North Port, FL 34287   (Sarasota County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $931,533 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of North Port is requesting sealed bids to secure the services of an experienced, professional, licensed, and qualified Contractor capable of providing construction services in accordance with the specifications and drawings to construct the City of North Port 2021 Water Distribution System Improvements in their entirety. If you have any questions, concerns, or problems accessing the bid package using the link, please contact Keith Raney, Contract Administrator II at 941.429.7103. Requests for additional information or clarification regarding the specifications must be sent via email to purchasing@Cityofnorthport.com. No verbal requests will be honored. All questions and clarifications must be submitted via e-mail by April 28, 2022, at 2:00 PM. The City of North Port does not discriminate on the basis of race, color, national origin, sex, age, disability, family or religious status in administration of its programs, activities or services.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents