Similar Projects
Ramblewood Pumping Station Valve Replacement
Infrastructure
Bidding
$92,000 est. value
Mount Laurel Township, NJ 08054

Well 5A PFOS Treatment System Upgrade
Renovation, Infrastructure
Bidding
$3,500,000 est. value
Willingboro, NJ

Water and Sewage Pump Maintenance and Repairs
Post-Bid
Wayne, NJ 07470

Geraldine Pump Station Grinder
Post-Bid
North Arlington, NJ

Electrical and Mechanical Maintenance, Servicing and Repair of Potable Water Wells, Pumping and Related Facilities
Results
Cedar Knolls, NJ 07927

J Street Well House Upgrades
Results
Seaside Park, NJ 08752

DDTH Pumping Station Project
Construction
Kearny, NJ 07032

Well No. 7 Building
New Construction, Infrastructure
Construction
$2,000,000 est. value
Evesham, NJ

Groundwater Containment Treatment System - Sump Pumps
Term Contract
Pending Verification
Boonton, NJ

The Cleaning and Redevelopment of the Radial Collector Well (Ranney Well) Laterals Project
Infrastructure
Bidding
Perth Amboy, NJ

Well No. 6 Retrofit
Post-Bid
Burlington, NJ 08016

2020 Redevelopment of Well No. 10
Results
Margate City, NJ 08402

Preventive Maintenance and Repair Service to Various Lift Stations, Pumps and Motors
Renovation, Infrastructure
Bidding
NJ

Maintenance and Repairs to Wells 5 and 8
Post-Bid
Turnersville, NJ

Furnish Various Spare Parts for Worthington Pumps
Results
Bayville, NJ 08721

Last Updated 04/14/2022 08:26 AM
Project Title

Pump Repair and Replacement and Rehabilitation

Physical Address View project details and contacts
City, State (County) Vineland, NJ   (Cumberland County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work included under this contract consists of work at one (1) water supply well station (Vineland Wells# 11). The work will include repairs and replacement to one deep well turbine pump, orifice testing after improvements to the pump, well redevelopment as specified, video inspection, and the installation of two drawdown (airline) tubes and one m-scope access tube at the well location. The pumping conditions will remain the same at Well Station #11 the well pump. Submittals on all new pumping equipment, repair and replacement parts, pipe coatings, and motors if required, shall be provided to the owner, and only after approval, placed on order.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents