Similar Projects
Bridge Rehabilitation
Infrastructure
Bidding
$750,000 CJ est. value
Harrisonville, MO 64701

Bridge Rehabilitation
Infrastructure
Bidding
$750,000 CJ est. value
Harrisonville, MO 64701

Hwy. 58 Traffic Circle for Raymore - Peculiar 2021 Bond - Ninth Grade Center project
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Raymore, MO 64083

Lighting, Fencing And Security Surveillance System(S
Alteration
Post-Bid

2021 Curb Replacement
Infrastructure
Post-Bid
Pleasant Hill, MO

163rd Street Improvements
Results
Pleasant Hill, MO 64080

Johnston Drive Sidewalk
Alteration
Results
Raymore, MO

Country Lane Storm Inlet Rehabilitation
Infrastructure
Bidding
$530,000 CJ est. value
Raymore, MO 64083

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Resurface on Route A and Route B
Infrastructure
Results
$15,000,000 to $20,000,000 est. value

Merle Road Asphalt Improvements
Infrastructure
Bidding
$800,000 CJ est. value
Baldwin Park, MO 64080

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Post-Bid
$100,000 to $250,000 est. value

Intersection Improvements and Resurfacing
Infrastructure
Results
MO

Intersection Improvements
Infrastructure
Bidding
$2,500,000 CJ est. value
Raymore, MO 64083

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

Last Updated 08/30/2022 04:07 PM
Project Title

Parking Lot Resurfacing, Electric Department

Physical Address View project details and contacts
City, State (County) Harrisonville, MO 64701   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract consists of the following two components: 2" Mill and Hotmix Asphalt Overlay And 4" Hotmix Asphalt Overlay Questions regarding this project should be directed to: Andy Pollard, Director of Electric Department, (816) 380-8962, apollard@harrisonville.com The Contractor shall fully complete the project within SIXTY (60) WORKING DAYS after the Contract time commences. A Bid Bond or certified check on a reputable bank in the amount equal to five (5%) percent of the total amount of the Bid must accompany each Proposal. No Bidder may withdraw his Bid for a period of sixty (60) days after date of opening of Bids. All wages paid for work under this Contract shall comply with requirements of the Prevailing Law of the State of Missouri, Missouri Public Law 294, Sec. 290.210 through Sec. 290.340, R.S.MO 1969, as amended and prevailing wages as established by the U. S. Department of Labor

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents