Similar Projects
Midmost Warehouse/Office, Frederick Industrial, Lot 3
New Construction - 34,827 SF
Conception
Frederick, MD

Frederick Exchange
New Construction - 416,850 SF
Conception
$44,000,000 est. value
Frederick, MD 21709

Mill Creek Subdivision
New Construction
Design
Frederick, MD

Jefferson Technology Park - Lincoln West II
New Construction - 116,948 SF
Design
Frederick, MD 21703

4450 Georgia Pacific
New Construction, Infrastructure - 95,012 SF
Bidding
$28,500,000 CJ est. value
Frederick, MD 21704

Thurmont Senior Center Parking Lot Expansion
Infrastructure
Bidding
$700,000 CJ est. value
Thurmont, MD 21788

Stanford Trading Center
New Construction - 73,990 SF
Post-Bid
Frederick, MD 21703

Frederick Shoppers World
New Construction, Infrastructure - 3,521 SF
Post-Bid
$1,000,000 CJ est. value
Frederick, MD 21702

B538 Office Renovation
Renovation
Results
$150,000 to $250,000 est. value
Frederick, MD 34949

Urbana Salt Yard Facility Upgrades
New Construction, Renovation, Demolition - 31,125 SF
Results
Less than $5,700,000 est. value
Ijamsville, MD 21754

Industrial Center East Lot 339
New Construction - 6,490 SF
Construction
Frederick, MD 21704

O'Connor Warehouse
New Construction - 22,000 SF
Construction
$4,367,000 est. value
Frederick, MD 21704

Monocacy Manor
New Construction, Infrastructure
Pending Verification
$81,000,000 CJ est. value
Frederick, MD 21701

Highland Trail
New Construction, Infrastructure - 15,000 SF
Pending Verification
$208,000,000 CJ est. value
Frederick, MD 21704

RunWay 5-23 Obstruction Removal and Extend RunWay 5 - 380067 - City of Frederick
Infrastructure, Alteration
Conception
$9,700,000 est. value
Frederick, MD 21701

Last Updated 08/10/2022 02:33 PM
Project Title

Stanford Industrial Park - Lot 12

Physical Address View project details and contacts
City, State (County) Frederick, MD 21703   (Frederick County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Office, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 10,000 square foot manufacturing and assembly facility and a 2,000 square foot office. As of August 10, this project is in the early planning stages, and is pending construction drawing approval from Frederick County. It has received site development plan approval from the Frederick County Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

,, 12,000 SF - 2,000 SF. 10,000 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents