Similar Projects
SE Technical Campus Classroom Remodeling
Renovation
Bidding
Waterford, MI

Seaholm Maintenance Building
Renovation
Bidding
Birmingham, MI

Clarkston 2016 Bond Projects - Bid Package 9
Post-Bid
Clarkston, MI

Anderson Middle School Cafeteria Addition
Addition
Post-Bid
Berkley, MI 48072

Van Hoosen Middle School Renovations 2020
Renovation
Results
Rochester, MI 48306

Reuther Middle School Renovations 2020
Renovation
Results
Rochester, MI 48307

Brother Rice High School - Locker Room & Academics Renovations - Phase 1B
Renovation - 19,550 SF
Construction
Bloomfield Hills, MI 48301

Novi Middle School Secure Entry and Music Wing Addition
Addition
Post-Bid
Novi, MI 48374

Oxford Community Schools 2017 Bond, Series 2
Build-Out
Results
Oxford, MI

2019 Bond Projects - Bid Package 4
Post-Bid
West Bloomfield, Wixom, MI 48323

2019 Bond Projects - Bid Package 1
Results
Walled Lake, MI

Bid Package 4 - Elementary Schools Additions and Remodeling, Concessions, HS Pool HVAC's, and MHS Parking lot and Upgrades
Renovation, Addition
Post-Bid
MI 48357

Oxford Community Schools Series 2 Bid Pack 4
Results
Oxford, MI

Oxford Community Schools 2017 Bond, Series 3
Post-Bid
Oxford, MI

Interior Renovations at West Bloomfield High School
Renovation
Results
Less than $1,070,000 est. value
West Bloomfield, MI

Last Updated 09/27/2021 08:15 AM
Project Title

High School Pool, Fitness Center and Locker Rooms

Physical Address View project details and contacts
City, State (County) Ferndale, MI   (Oakland County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents