Similar Projects
Alum Creek (Fra-Cr16-1.52), Full Closure
Renovation, Alteration
Bidding
$6,665,759 est. value
OH

Road/Bridge Improvements
Renovation, Alteration
Post-Bid
$1,616,042 est. value
OH

Schiller Park Pedestrian Bridge Repair
Results
Columbus, OH 43206

Bridge Cleaning and Sealing 2020
Results
Columbus, OH

Bridge Rehabiltation - Lehman Road Bridge Replacement
Results
Columbus, OH

Bridge Repair - D06 Bridge Repair FY21
Results

Muirfield Drive at Brand Road Bridge Replacement
Renovation
Results
$1,300,000 est. value
Dublin, OH

Three Quarry Trails Metro Park Pedestrian Bridges
New Construction
Results
$268,739 est. value
Columbus, OH 43228

Bridge Replacement (1 Bridge) - Etna St / Elbern Ave Pt 1 and Pt 2
New Construction
Results
Whitehall, OH 43213

Quarry Trails Metro Park Pedestrian Bridges Installation Package
New Construction
Results
$320,000 est. value
Westerville, OH 43081

Bridge Deck Sealer
New Construction, Term Contract
Results

Combined Schleppi Road Drainage Improvement and Schleppi Road Bridge Replacement
Infrastructure
Results
$580,190 est. value
OH

Improvement of Olentangy River
New Construction, Infrastructure
Results
$1,409,587 est. value
OH

OPWC : Bethel-New Hope Bridge
New Construction
Results
Columbus, OH 43215

Bridge Repair-FRA-SR 104-05.63
New Construction, Infrastructure
Results
OH

Last Updated 03/16/2022 09:05 AM
Project Title

Improvement of Winchester Pike 0.87 Over Georges Creek

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,485,278
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrading 0.04 miles of C.R. 376 (Winchester Pike) by replacement of an existing noncomposite box beam bridge over Georges Creek with a continuously reinforced concrete slab bridge and minimal roadway approach work.

Details

Bridge, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents