Similar Projects
Bridges Over State Route 109 and Over the DT & I Railroad in Fulton County / Wauseon
Demolition, New Construction, Infrastructure
Design
$1,329,657 CJ est. value
Wauseon, OH 43567

Bridges Over State Route 109 and Over the DT & I Railroad in Fulton County / Wauseon
Demolition, New Construction, Infrastructure
Design
$1,329,657 CJ est. value
Wauseon, OH 43567

Villagewide Water Main Replacement
Infrastructure
Bidding
$500,000 CJ est. value
Fayette, OH 43521

Commercial Drive New Road Construction
Infrastructure
Post-Bid
$300,000 est. value
Delta, OH

Resurface Metamora-Amboy Fire Department
Infrastructure
Post-Bid
$430,000 est. value
Metamora, OH 43540

Two Lane Resurfacing - SR 120-00.00 Resurf
Infrastructure
Results
$2,055,960 est. value
Lyons, OH

Wauseon South Brunell Street Roadway Reconstruction
Alteration
Results
$1,147,917 est. value
Wauseon, OH

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

East Lutz Road Improvements
Infrastructure
Results
$1,020,000 est. value
Archbold, OH 43502

Commercial Drive New Road Construction - Nature Fresh
Infrastructure
Post-Bid
$800,000 CJ est. value
Wauseon, OH 43567

Intersection - SUM-Wooster Road Robinson
Infrastructure
Results
$1,248,937 est. value

Sealcoating
Infrastructure
Post-Bid
$200,000 CJ est. value
Wauseon, OH 43567

2022 Harding Township O.P.W.C. Shaffer Road Resurfacing Project
Infrastructure
Results
$550,000 est. value
Swanton, OH 43558

2023 Hot Asphalt Paving of Certain Streets
Infrastructure
Post-Bid
$251,000 CJ est. value
Wauseon, OH 43567

2022 Fulton County Seal Coat Program
Alteration
Results
$1,487,320 est. value
Wauseon, OH

Last Updated 05/03/2023 10:32 AM
Project Title

Rehabilitation of West General Aviation Apron at Eugene F. Kranz Toledo Express Airport

Physical Address View project details and contacts
City, State (County) Swanton, OH 43558   (Fulton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Runways/Taxiways, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $4,704,412 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of West General Aviation Apron Eugene F. Kranz Toledo Express Airport, Swanton, OH 43558 This contract is for all labor, material, insurance, and equipment necessary for the Rehabilitation of West General Aviation Apron project located at Eugene F. Kranz Toledo Express Airport, Swanton, Ohio 43558, in accordance with the specifications, for the Toledo-Lucas County Port Authority at One Maritime Plaza, Toledo, Ohio 43604. The proposed project at Eugene F. Kranz Toledo Express Airport (TOL) includes the rehabilitation of roughly 345,000 square feet of bituminous asphalt pavement with grade correction on the West General Aviation Apron as well as the relocation and construction of a new taxiway connector, roughly 69,000 square feet of new bituminous asphalt pavement. Modification to existing drainage infrastructure and structures adjacent to the West General Aviation Apron is also included to combat soil erosion. Project phasing has been established to enable safe integration of construction and continuous aircraft operations during the project. The project will be part of a federal grant with the anticipated schedule permitting construction of the new taxiway connector in the fall of calendar year 2023 (45 days) with the remainder of work to resume in the spring of calendar year 2024 (49 days). Electronic Proposals must be submitted on the form(s) included in Bid Express and shall be accompanied by a certified check or an acceptable Proposal Bond with satisfactory surety specifying the Toledo-Lucas County Port Authority as the obligee, in the sum of not less than ten percent (10%) of the total proposal amount. Any bid may be withdrawn prior to the scheduled closing time for receipt of bids. The successful bidder will be required to submit a Contract Bond and Certificate of Insurance. The Port Authority's goal for Disadvantaged Business Enterprise (DBE), participation in the project shall be fifteen percent (15%), and bidder shall provide documentation of its ability to achieve that goal or, if the Port Authority's goal is not attainable by bidder, bidder shall provide an affidavit detailing why that goal was not attained. A bid that fails to meet this requirement will be considered non-responsive. The lowest responsive and responsible bid shall be determined in accordance with the Port Authority's Resolution No. 68-00 as found in the General Conditions. The Port Authority reserves the right to reject any or all bids, and to waive any technicalities as it may deem best for their interest. The Port Authority also reserves the right to add or subtract from quantities shown in the proposal. The Toledo-Lucas County Port Authority (TLCPA or Client) owns and operates Eugene F. Kranz Toledo Express Airport (TOL or Airport). TLCPA has selected RS&H Ohio, Inc. (RS&H or Consultant) to provide design/engineering and bidding phase services for the General Aviation Ramp Improvements project consisting of the following three project areas: 1. Rehabilitate West General Aviation (GA) Apron 2. Shift or Reconfigure Existing Taxiway B11 3. Improve Airport Drainage/Erosion Control The proposed project will include pavement rehabilitation, drainage improvements, new taxiway pavement construction, and taxiway safety area grading improvements. The design and bidding are programmed to be completed by Spring of 2023 with construction to follow. Specific project elements are noted below. The overall project limits are shown in Figure 1 Specific work elements include the following: o Rehabilitation of General Aviation Ramp pavement o Taxiway Safety Area Grading Improvements o Taxiway Relocation/New Construction and Demolition o Drainage Improvements o Pavement Marking Rehabilitation o Topographical Survey o Geotechnical Investigation o Categorical Exclusion Documentation for Environmental Clearance o Waters of the United States (WOTUS) Delineation Survey Please submit all questions through the Bid Express service by Tuesday, April 11, 2023, at 10:00 AM local time.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents