Similar Projects
Fuel Tank Inspection for USCG Base Elizabeth City, NC
Bidding
Elizabeth City, NC 27909

Diesel Fuel Ast Replacement
Bidding
Fayetteville, NC

Underground Storage Tank Removal
Post-Bid
Cary, NC

Demolition Services for Harnett County Public Building/Facilities Management
Demolition
Post-Bid
Olivia, NC 27332

Main Campus Steam Plant - Fuel Oil Containment Facilities Replacement
Results
Less than $2,227,900 est. value
Greenville, NC 27858

Residential Gas Meters
Results
Rocky Mount, NC

Former Police HQ Building - Underground Storage Tank Closure
Post-Bid
Raleigh, NC 27601

Hypochlorite Tank #1 Replacement
Results
Less than $520,000 est. value
Kannapolis, NC

Petroleum Tank Installation, Operations and Maintenance Services
Term Contract
Post-Bid
Charlotte, NC 28206

Fuel Farm Expansion Phase III
Results
Charlotte, NC

Fuel Storage Tanks
Term Contract
Post-Bid
Raleigh, NC 27699

Gas Leak Detection and Atmospheric Corrosion Survey Services
Term Contract
Results
Greenville, NC 27834

Liquefied Petroleum Gas & Tank Monitoring Services
Post-Bid
Jacksonville, NC 28542

Boat Refueling System Repairs for the U.S. Coast Guard (USCG) Station Hatteras Inlet
Results
Hatteras, NC 27943

Maintenance Fuel Facility Secondary Containment Bid Package
Post-Bid
Raleigh, NC

Reported 05/05/2020 12:00 AM
Project Title

Replace Natural Gas Piping (House Piping)

Physical Address View project details and contacts
City, State (County) Weldon, NC 27890   (Halifax County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Installing the House Piping for the Natural Gas System on Buildings 100, 200, and 300 at Halifax Community College. The agreement is to include the removal of steel gas piping where specified during the site visit (approx. 300 feet). The installation of new piping where specified during the site visit (approx. 600 feet). The removal of old regulators and the installation of new regulators where specified during site visit. The installation of 2 underground 1 underground caps/plug that will be installed on plastic pipe that will be abandoned in place. All materials and footages shall be field verified by the contractor. All building/mechanical codes shall be followed at all times. Pressure treated blocks and hangers will be supplied to support all gas piping installed on the roof. All new piping will be painted and labeled per code.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents