Last Updated | 07/30/2021 09:40 AM |
Project Title | Holly Implementation Phase 1 - Lake Front Trail |
Physical Address | View project details and contacts |
City, State (County) | Austin, TX (Travis County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Item 1: Furnish and/or installation of including, but not limited to, precast concrete panel fencing, access gates, non-conductive fencing and footings along with removal and disposal of existing fencing, fence posts, footings, gates, etc. and selective demolition of existing masonry/wood fence within and adjacent to an operational Austin Energy Substation and an operational park. Item 2: Furnish and/or installation of improvements including, but not limited to, concrete trail, sidewalks, stairs, pedestrian handrails, pedestrian guardrails, trash and recycle receptacles, benches, bike racks, traffic bollards, grading and earthwork, stone wall, storm drain infrastructure and pipe, site utilities, tree and landscape installation, site revegetation, landscape and revegetation establishment and watering, erosion control, tree protection, along with demolition, removal and disposal of existing site and utility improvements, tree removal within and adjacent to an operational Austin Energy Substation and an operational park. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |