Similar Projects
Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Eagle Drive Extension Project
Post-Bid
Pagosa Springs, CO

CO CRVFO Roads & Construction IDR 2020
Results
$25,000 to $150,000 est. value

CO LSFO Roads & Construction IDR 2020
Results
$25,000 to $40,000 est. value

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

CO KFO Roads & Construction IDR 2020
Results
$25,000 to $170,000 est. value

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

2020 Asphalt Maintenance Project
Results
Less than $196,653 est. value
Pagosa Springs, CO

North Pagosa Boulevard Resurfacing and Bridge Repair Project
Post-Bid
CO

San Juan National Forest, Pagosa Ranger District, Turkey Springs Road Resurfacing. This Solicitation Updates And Replaces Solicitation Number 1282CS20R0005
Results
Pagosa Springs, CO

Buttress Avenue and Port Avenue Asphalt Surfacing
Post-Bid
Pagosa Springs, CO

US 160 MP 126 to 129 Wildlife Crossing and Widening
Results
$5,000,000 to $20,000,000 est. value
CO

Hot Mix Mill and Overlay 2020
Results
Pagosa Springs, CO 81147

Centerra Parcel 301 Public Infrastructure
Results
$1,000,000 to $1,500,000 est. value

Kinston Residential Phase 1B Public Infrastructure
Results
$1,500,000 to $2,000,000 est. value

Reported 07/23/2021 12:00 AM
Project Title

2021 North Pagosa Boulevard Trail Project

Physical Address View project details and contacts
City, State (County) Pagosa Springs, CO   (Archuleta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 07/06/21
Owner View project details and contacts
Architect View project details and contacts
Description

The base project consists of constructing approximately 850 linear feet of asphalt multi-use trail along North Pagosa Boulevard from the northerly intersection of Lakeside Drive, proceeding southeasterly over the Village Lake Spillway and ending near the southerly intersection of Lakeside Drive, tying into the existing concrete pedestrian trail. This portion of the project will include topsoil removal and replacement, excavation, embankment, subgrade preparation, drainage structures, aggregate base course placement, and asphalt trail construction as well as all associated construction of two concrete abutments and placement of a prefabricated steel pedestrian bridge across the Village Lake Spillway. This project will also include the construction of approximately 950 linear feet of gravel pedestrian trail along North Pagosa Boulevard from the northerly intersection of Hatcher Circle, proceeding southerly and ending across North Pagosa Boulevard at the property owned by the PLPOA. This portion of the project will include topsoil removal and replacement, excavation, embankment, subgrade preparation, drainage structures and gravel trail construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents