Similar Projects
Water Main Replacement Program - Taft Street To Sherdian Street - City Of Hollywood
Infrastructure
Conception
$7,035,000 est. value
Hollywood, FL 33026

RFP Engineering - SR-817/Unvsty Dr fr S of SR-848/Stirling Rd to N of SW 36 St
Infrastructure
Conception
$1,100,000 CJ est. value
Plantation, FL 33317

Aviva on the River
New Construction, Infrastructure - 7,969 SF
Design
$37,000,000 CJ est. value
Fort Lauderdale, FL 33301

The Fletch
New Construction, Infrastructure - 12,621 SF
Design
$3,700,000 CJ est. value
Hollywood, FL 33020

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Bidding
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

SW 10th Street Connector Transportation Systems Management and Operations
Infrastructure
Bidding
$36,170,926 CJ est. value
Deerfield Beach, FL 33442

Fence Replacement at the Wastewater Treatment Plant
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Hollywood, FL 33019

Town Hall Demolition
Demolition, Infrastructure
Sub-Bidding
$350,000 CJ est. value
Davie, FL 33314

Hollywood Hills ES - SMART Program Renovations
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hollywood, FL 33021

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

Water System Rehabilitation - Breezeswept Park Estates Phase B
Results
$2,001,300 est. value
Plantation, FL

Honey Hill Drive Off-Site Improvements Project
Results
$165,000 est. value
Miramar, FL 33027

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Dominos # 5082-2
Alteration
Construction
Plantation, FL 33324

The Tropic
New Construction, Infrastructure - 2,200 SF
Pending Verification
$60,000,000 CJ est. value
Hollywood, FL 33020

Last Updated 08/05/2022 08:34 AM
Project Title

Trenchless Rehabilitation and Pipe-Bursting Technology

Physical Address View project details and contacts
City, State (County) Pompano Beach, FL 33060   (Broward County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has selected a Construction Manager. The project is expected to start construction in 7/26/22. The City of Pompano Beach (the "City") will receive sealed proposals for Request for Proposals (RFP) E-15-22, Trenchless Rehabilitation and Pipe-Bursting Technology. Proposals must be submitted electronically through the eBid System on or before the due date and time as specified herein. RFP openings are open to the public. All Proposers and/or their representatives are invited to be present. Any proposal received after the due date and time specified will not be considered. Any uncertainty regarding the time a proposal is received will be resolved against the Proposer.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents